
The Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for 650MW of grid-connected solar PV projects at the Kadapa Solar Park in Andhra Pradesh.
The capacity, which is split into 500MW open category and 150MW under Domestic Content Requirement (DCR) rules, comes under the National Solar Mission, phase II, batch IV.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
Last March, Indian state-owned utility NTPC also issued an RfS for solar developers to set up a 250MW solar PV project in the Kadapa Solar Park.