‘Solar Module Super League’ (SMSL) member, JA Solar is supplying its high-efficiency bifacial PERC modules for two 2.4MW PV projects in South Korea, the largest projects so far to use the technology in the country.
Materials giant is sticking to its rigorous testing, including use of its ‘Tedlar time machine’, and gearing up for a period of greater solar tech diversity.
‘Solar Module Super League’ (SMSL) member LONGi Solar has supplied 168MW of high-efficiency’ Hi-MO 1’ monocrystalline PERC modules to Sunseap International’s completed PV power plant in Ninh Thuan province, Vietnam.
Van der Valk Solar Systems and BirdBlocker have teamed to bring the ‘BirdBlocker’ device to the UK and Ireland. Birds can build nests under rooftop PV panels, which can result in sound pollution or damage to the panels and PV system. The BirdBlocker system is designed to be installed easily with new panels or retrofit.
JinkoSolar Supplies 7.8MW for two PV plants in Hungary, 10MW solar farm connected in Afghanistan, Vietnamese firm completes 50MW project in Ninh Thuan, Photon Energy connects 2.1MW of projects in Hungary, First solar plant in Iran's Khorasan Razavi completed.
PV ModuleTech will be returning to Penang, Malaysia on 22-23 October 2019. The agenda sessions and topics at PV ModuleTech 2019 will focus on the key global issues today in terms of module technology, quality, and reliability – specific to large-scale module purchasing decisions over the next 12-18 months.
The PV industry is undergoing rapid technology changes that have been driven by the well documented, swift adoption of monocrystalline wafers. Less well understood is that, within this wafer technology transition comes a shift to larger wafer sizes and this includes p-type and n-type mono-Si wafers.
Manufacturing roots, staying small, patience with PPAs and avoiding grid speculation will all help seize crown of Europe’s hottest PV market, firm tells PV Tech.
The largest monocrystalline wafer producer, LONGi Green Energy Technology Co has signed another project investment agreement to build and operate a 5GW PV module assembly plant.