The plant is located near the Yellow River estuary, on 1200 acres of alkali land, and is equipped with GoodWe GW225kW-HT high power smart inverters with 1500V system design, 99% efficiency and high-power tracking density, backed up by up to 168 MPPTs for a 3.15MW PV array. The 30A max current per MPPT makes the inverters highly compatible with both 182mm and 210mm high-power bifacial modules.