KSTAR’s 1100V string grid-tied PV inverter supports bifacial modules and ESS in C&I applications

August 26, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
The multiple MPPT capability greatly increases the match between the solar array (PV panels), EES and utility grids. Image: KSTAR

KSTAR has launched a new 1100V string grid-tied PV inverter with advanced features to support the adoption of high-performance bifacial modules and energy storage systems (ESS) for Commercial & Industrial (C&I) PV power plants designed to meet a wide-range of applications. The KSG-150UM/KSG-120CL series of inverters can be used in harsh environments with optimised performance harvesting.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Grid-tie inverters convert DC electrical power into AC power suitable for injecting into grids. The grid tie inverter (GTI) must match the phase of the grid and maintain the output voltage slightly higher than the grid voltage. As a result, a high-quality string grid-tie inverter, which has good performance and long-life working time in harsh environments and non-optimised settings is required. Advanced inverter functions are also needed to ensure the adoption of new technologies, such as bifacial modules and ESS are efficiently harvest for the lowest project LCOE (Levelised Cost of Electricity).

Solution

The 120KW-150KW KSG-150UM/KSG-120C string inverter has a 10/12 MPPT design for maximum energy harvest. The multiple MPPT capability greatly increases the match between the solar array (PV panels), ESS and utility grids. The MPPT converts a higher voltage DC output from solar panels down to the lower voltage needed to charge batteries. MPPTs are most effective under conditions such as winter seasons, low battery charge and long wire runs.

The KSG-150UM/KSG-120CL delivers a smart I-V Curve function for improving maintenance efficiency, which is used to check whether the state is good and whether there are shadowing effects, as well as accurate identification of problems, reducing time and cost for manual inspection. The smart I-V Curve function is a 100% online solution, improving remote monitoring capabilities.

The string inverter has a high precision RCD (Residual Current Device) protection circuit, constantly monitoring the current flowing in the live and neutral wires that operates quickly at a low earth leakage current, reducing safety issues. It can also be supplied with optional AFCI (Arc Fault Circuit Interrupters) and night SVG (Static Var Generator) functions. High precision RCD protection circuit helps to secure personal safety, while AFCI greatly reduces system risk, and the Night SVG function improves the grid support capacity. In addition, the latest string grid-tied PV Inverter is equipped with built-in PID (Potential Induced Degradation). Active arc protection can accurately detect any arc fault, and the inverter is shut down in 2.5 seconds to eliminate the arcing effects.  

Applications

Commercial and industrial PV power plants. The IP66 design can be used in extremely harsh environments, including temperatures of minus 25 degrees temperatures, through to floating solar plants. 

Platform

KSTAR developed an advanced online O&M platform Ksolar via Cloud Storage for the management of solar power plants. The collector can monitor the inverter, combiner box, DC distribution cabinet and box type transformer of PV power stations. In addition, a small meteorological monitor can be connected to monitor the environmental quantity of the power station. To ensure the operational uptime, the inverters are LED+Bluetooth APP/PLC Optional, as well as having a maximum DC/AC ratio of up to 1.5. Optional interfaces include RS485 / WiFi, GPRS, PLC.

Availability

August 2020 onwards.

Read Next

February 5, 2026
The 26GW Australian Renewable Energy Hub (AREH) in Western Australia has secured AU$21 million (US$14.71 million) in funding from the Australian Renewable Energy Agency (ARENA) to advance large-scale hydrogen production capabilities that will support green iron manufacturing in the Pilbara region.
February 4, 2026
Industry leaders warn that hybridising PV with batteries is now essential to secure revenue, manage volatility, and maintain investor value.
February 4, 2026
In the wake of Russia’s invasion of Ukraine, European energy has gone from an overreliance on Russia to an overreliance on China.
February 4, 2026
Spanish renewable energy company Zelestra has finalised a power purchase agreement with Facebook’s parent company Meta for its 176MW Skull Creek Solar Plant in Texas.
February 4, 2026
US authorities have hit back at a WTO ruling that subsidies for domestically produced solar and other clean energy components discriminate against Chinese firms.
Premium
February 4, 2026
The latest edition in our NEM Data Spotlight series delves into solar PV data from January 2026 and how it hit a daily peak of 222GWh.

Upcoming Events

Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA