Latin America PV installations to rise 350% in 2015

May 18, 2015
Facebook
Twitter
LinkedIn
Reddit
Email

Latin America is forecast to install 2.2GW of PV in 2015, a 352% increase from 625MW in 2014, according to the recently released 'Q1 2015 Latin American PV Playbook' report from GTM Research.

Half the projects will be in Chile. meanwhile Honduras is forecast to undertake a huge rise to 460MW installed capacity in 2015, up from 5MW in 2014. It will overtake Mexico as the region's second biggest market. Meanwhile Brazil will fall off the top five market list below Panama and Guatemala.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The region’s total pipeline is now 34GW, with 25GW announced, 6.8GW contracted, 1.9GW under construction and 943MW operational.

In Q1 2015, the region installed 207MW.

A GTM statement said Latin America is positioned to be one of the most attractive regions for solar development in the world.

The previous report, covering Q4 2014, revealed that the Latin America PV market grew by 370% last year, with Chile accounting for more than three quarters of total production.

GTM's top five PV Installed capacity table:

  2014 2015 (forecast)
1st Chile Chile
  493MW 1GW
2nd Mexico Honduras
  67MW 460MW
3rd Brazil Mexico
  22MW 195MW
4th Guatemala Guatemala
  6MW 98MW
5th Honduras Panama
  5MW 62MW

Read Next

December 5, 2025
BayWa r.e. has sold two of its UK solar farms, which have a combined capacity of 89.9MW, to global asset management firm Capital Dynamics
December 5, 2025
Origis Energy has raised US$265 million in finance from Advantage Capital to support the development of a 305MW solar PV portfolio in the US.
December 5, 2025
WBS Power has sold the 150MW solar, 500MW/2,000MWh BESS Project Jupiter in Brandenburg, Germany, to investor Prime Capital.
December 5, 2025
Over 140 US solar companies have urged Congress to reconsider changes to permitting which they say have resulted in “a nearly complete moratorium” on solar project permits.
Premium
December 5, 2025
In November, the Colorado PUC ordered utility Xcel Energy to provide higher-quality information, and introduce flexible tariffs.
December 4, 2025
High power prices and increased energy storage usage have led to a sharp increase in self-consumption of solar power in Germany since 2022, according to data from the Fraunhofer Institute for Solar Energy Systems (ISE).

Upcoming Events

Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA