Latin America PV installations to rise 350% in 2015

Facebook
Twitter
LinkedIn
Reddit
Email

Latin America is forecast to install 2.2GW of PV in 2015, a 352% increase from 625MW in 2014, according to the recently released 'Q1 2015 Latin American PV Playbook' report from GTM Research.

Half the projects will be in Chile. meanwhile Honduras is forecast to undertake a huge rise to 460MW installed capacity in 2015, up from 5MW in 2014. It will overtake Mexico as the region's second biggest market. Meanwhile Brazil will fall off the top five market list below Panama and Guatemala.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The region’s total pipeline is now 34GW, with 25GW announced, 6.8GW contracted, 1.9GW under construction and 943MW operational.

In Q1 2015, the region installed 207MW.

A GTM statement said Latin America is positioned to be one of the most attractive regions for solar development in the world.

The previous report, covering Q4 2014, revealed that the Latin America PV market grew by 370% last year, with Chile accounting for more than three quarters of total production.

GTM's top five PV Installed capacity table:

  2014 2015 (forecast)
1st Chile Chile
  493MW 1GW
2nd Mexico Honduras
  67MW 460MW
3rd Brazil Mexico
  22MW 195MW
4th Guatemala Guatemala
  6MW 98MW
5th Honduras Panama
  5MW 62MW

Read Next

August 26, 2026
JinkoSolar shipped 15.9GW of modules in the second quarter of this year, which represents a 34.4% year-on-year decline.
Premium
August 26, 2026
UL Solutions warns that US plug-in PV faces key safety challenges, with UL 3700 aiming to address fire, shock and circuit-overload risks.
August 26, 2026
California-based start-up Tandem PV has been awarded a US Department of Energy grant to accelerate the commercial scale-up of its perovskite PV technology.
August 26, 2026
California’s Assembly has unanimously voted in favour (73-0 and six no votes registered or NVR) of a balcony solar bill, Senate Bill 868.
August 26, 2026
India’s renewable capacity reached 288GW by June 30, 2026, accounting for 54% of total installed capacity, JMK reported.
August 26, 2026
WElink Energy Portugal 2, the owner of Portugal’s largest solar PV project, has entered administration, owing debts of US$77.7 million.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye