New Product: Pressure compensation seal from Schreiner ProTech protects junction box

March 1, 2010
Facebook
Twitter
LinkedIn
Reddit
Email

Product Briefing Outline: Schreiner ProTech has designed a rugged, self-adhesive Pressure Compensation Seal (PCS), especially designed to provide solar module junction boxes with long-lasting protection against severe environmental conditions, preventing damage to sensitive electrical components. The product has already been selected by KOSTAL Industrie Elektrik to be integrated into their PV modules' junction boxes.

Problem: Condensation, specifically when formed in the photovoltaic (PV) module and transferred into the junction box, can decrease power output and corrode electrical contacts resulting in safety issues. While the value of alternative energy sources like solar power is increasing, the production costs of solar energy systems need to be reduced and reliability improved to ensure long-term viability.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Solution: new splash-proof (PCS) membrane vent material that delivers permanent weather resistance and prevents the intrusion of water, oil and dust within the junction box housing, even after the component has been submerged into water for 30 minutes. Ideally suited for use with solar power systems, Schreiner ProTech's new water-repellent membrane ventilates solar module junction boxes, thus reducing the harmful effects of condensation within the housing while offering reliable protection to PV modules that is vital to improving their longevity.

Applications: PV module junction boxes.

Platform: Schreiner ProTech's PCS meets the high standards of the IP 67. Additionally, the PCS can be customized and installed off the roll in a semi- or fully-automated process, enabling leaner manufacturing processes and lower production costs.

Availability: February 2010 onwards.

Read Next

December 30, 2025
Greenwood Energy has reached financial close for the first phase of its 52MWp Terra Site I solar project in Colombia.
December 30, 2025
CHN Energy has started full commercial operations at the 1GW HG14 floating PV (FPV) project off the coast of Dongying in China.
December 30, 2025
Fortis Energy has begun the construction phase of the 75MW Ersekë solar PV project in Albania, which is co-located with a BESS.
December 29, 2025
Mexico has awarded 3.3GW of renewable energy capacity, of which solar PV will account for 2.6GW of capacity.
Premium
December 29, 2025
PV Tech spoke with accountancy firm Baker Tilly about the new safe harbour and 'start of construction' rules for US solar projects.
December 29, 2025
The Glenfarne Group has acquired a portfolio of solar PV and co-located BESS assets in Chile from Metlen Energy & Metals.

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
November 24, 2026
Warsaw, Poland