8minute, Doosan GridTech to collaborate on predictive solar-plus-storage dispatch controls

October 28, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
Image: 8minute.

Leading US solar developer 8minute Solar Energy is to collaborate with Doosan GridTech to use advanced, predictive software controls to dispatch energy from solar-plus-storage plant in California.

The duo are to use the new, Doosan-built software at the Springbok 3 Solar farm which forms part of the Springbok cluster in Kern County, California. The software platform will be used alongside 8minute’s approach to energy dispatch, aimed at maximising the value of the energy both generated and stored on-site.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

It’s intended that the solution will prove the predictability of the plant’s output, benefitting 8minute and the Los Angeles Department of Power & Water, the facility’s offtaker.

The 121MW Springbok 3 solar array was inaugurated earlier this month, boasting a 1.5MWh battery system. Renewables investor Capital Dynamics closed financing on the project in May this year.

The wider Springbok cluster is more significant at 448MW.

Doosan’s intelligent controller boasts a number of operating modes, including ‘active power smoothing’ and ‘predictive active power response’, which bid to give the plant a smoother or flatter output. This will enable both Doosan and 8minute to develop so-called block strategies, paving the way for projects to deliver contingency frequency support services to local grids as well as its regular output.

Tom Buttgenbach, president and CEO at 8minute, said dispatchable solar-plus-storage assets will be the “backbone of the 21st Century grid”, but stressed the need for innovative software that communicates with grids as a hugely important component of that future.

“Matching Doosan’s software ingenuity with our best-in-class technology, engineering, and sophisticated infrastructure financing, we will continue to deliver results and drive down costs while increasing energy production,” he said.

Read Next

April 28, 2026
Vikran Engineering has agreed to acquire a 49% equity stake in NOPL Solar Projects Private Limited for INR49 million (US$508,101).
April 28, 2026
US utility Georgia Power filed a request with the Georgia Public Service Commission (PSC) seeking 2,000MW – 6,000MW of new dispatchable capacity resources in the state.
April 28, 2026
Prospective solar wafer manufacturer Sunwafe has appointed a new CEO and secured permits for a 30-hectare site in northern Spain, in efforts to establish Europe’s “first” large-scale, 20GW silicon ingot and wafer production facility.
April 27, 2026
Social media tech giant Meta has signed an agreement to procure power from space-based solar power startup, Overview Energy.
April 27, 2026
The NYSERDA has launched an onshore solicitation programme to supporting the development of onshore wind, solar, and hydroelectric projects. 
April 27, 2026
Indian renewable energy major Adani Green Energy (AGEL) reported a 48% year-on-year increase in operational capacity to 17.24GW, driven predominantly by solar.

Upcoming Events

Upcoming Webinars
May 27, 2026
9am BST / 10am CEST
Media Partners, Solar Media Events
June 3, 2026
National Exhibition and Convention Center (Shanghai)
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain