All systems go for Colombia’s largest PV plant to date

April 8, 2019
Facebook
Twitter
LinkedIn
Reddit
Email
Construction for the 250,000-panel El Paso plant started last May (Credit: Enel)

Colombia’s top leadership has hailed the country’s “renewable revolution” as the ribbon was cut for the largest PV plant opened to date.

President Iván Duque and energy minister María Fernanda Suárez attended the inauguration of the 86.2MW El Paso plant, the work of Enel Green Power Colombia.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The firm started building the 250,000-panel, 176GWh-a-year installation last May, and had it linked to Colombia’s national grid via El Paso Substation.

First PV victory at reliability charge auctions

As noted by president Duque, the PV plant is the first to provide power under the so-called reliability charge scheme.

The auction programme – where alternative sources are contracted to bolster Colombia’s hydro-reliant power system in case of drought – awarded contracts to El Paso, as well as a separate Emgesa project, in March this year.

“To those who didn’t think this possible under this government, the message is now clear…we’re showing Colombia that the renewable revolution is already beginning,” said Duque, elected president last June.

Calls for new framework for self-consumption

El Paso’s opening looks set to breathe air into Colombia’s still-modest PV scene. Further large-scale projects – Diverxia’s 240MW, Celsia’s 8.8MW – could add a further boost to installed PV capacity, which according to IRENA sat at 87MW last year.

The government’s efforts to stimulate renewables via auctions have proved mixed. Despite success with the reliability charge scheme, a separate tender for large-scale clean energy projects was cancelled in February, with plans for a new attempt during Q2 2019.

In parallel, proposals have been tabled to subsidise off-grid domestic PV across Colombia’s poorer, grid-isolated municipalities. Last week, a panel by renewable association SER Colombia called for a new regulatory framework for distributed generation, with claims that self-consumption continues to face obstacles despite the government’s constructive disposition.

Read Next

February 2, 2026
Independent power producer (IPP) TerraForm Power has acquired a 1.56GW solar project in Lee County, Illinois from Hexagon Energy.
February 2, 2026
The rate of installation of new self-consumption PV systems in Spain fell slightly last year, according to data from trade body the Spanish Photovoltaic Union (UNEF).
February 2, 2026
India’s Union Budget 2026-27 reinforces government support for renewables through duty exemptions and infrastructure spending.
Premium
February 2, 2026
PV Tech Premium explores the impacts that the EU's revised cybersecurity review will have on the continent's solar industry.
January 30, 2026
India Power Corporation Limited has partnered with Bhutan’s Green Energy Power Private Limited to develop a 70MWp solar power plant in Paro, Bhutan
January 30, 2026
 Scatec has reported strong fourth-quarter results with proportionate revenues increasing 25% year-on-year to NOK3,362 million (US$2.68 billion).

Upcoming Events

Solar Media Events
February 3, 2026
London, UK
Upcoming Webinars
February 18, 2026
9am PST / 5pm GMT
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA