Falling installation figures confirm decline in German solar

Facebook
Twitter
LinkedIn
Reddit
Email

Predictions that Germany will lose its place as Europe’s largest PV market this year appear to be playing out, with the country registering just over 1GW of new capacity in the first half of 2014.

This is compared to the UK, which has been widely touted as the main contender for the European solar crown this year and managed 1.4GW of new capacity in the first six months of the year, according to analysis by NPD Solarbuzz.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The German government has imposed a cap of 2.5GW of new PV for 2014, but figures published by the German Federal Network Agency this week bear out recent comments from national trade body BSW-Solar that this target will not be reached.

The figures reveal that a total of 188.5MW was installed in June 2014, down from 204MW in May, but about the median compared to what has been achieved in other months so far in 2014.

By comparison, in the first six months of 2012 and 2013 Germany installed 4.4GW and 1.8GW respectively.

Although Germany now has a cumulative PV capacity of over 36GW, its stalling progress is a consequence of moves by the government to slow the market down by reducing feed-in tariffs, imposing a cap and revising the country’s EEG renewable energy laws.

These come into effect today and will bring in a number of changes.

Most controversially, they will include a range of new charges on PV users self-consuming power they generate. Although systems smaller than 10kW will remain exempt from the surcharge, any systems above this size commissioned from today will be required to pay a proportion of the EEG surcharge that will rise to 40% by 2017.

Another significant change is that a direct marketing requirement planned for commercial PV systems will be brought forward. This means that power from systems larger than 100kW will have to be sold directly through power purchase agreements from 2016 rather than 2017, as previously expected.

The UK has been predicted to reach a minimum of 2.9GW this year, about double what it achieved last year.

However, the UK’s solar boom could be short-lived depending on how the market responds to the government’s decision to introduce changes to the support mechanism for large-scale solar earlier than expected to curb runaway demand.

In May it announced it would scrap the renewable obligation scheme for projects over 5MW by next year instead of 2017. Instead it will make the new ‘contracts for difference’ mechanism the main form of support for large-scale solar, though there are concerns this will not be adequately resourced to provide a satisfactory replacement for the RO scheme.

Read Next

June 19, 2026
The Australian Renewable Energy Agency (ARENA) has committed an additional AU$95.4 million (US$66.8 million) in funding to the Australian Centre for Advanced Photovoltaics (ACAP), extending the research programme's operations to 2033.
Premium
June 19, 2026
Module quality and reliability concerns, HJT, manufacturing in Africa and hail were among the key topics discussed at PV ModuleTech USA.
June 18, 2026
Aiko has signed a 1.2GW module supply deal with Infinity Power to supply modules for the latter’s Nefer Menya solar-plus-storage project.
June 18, 2026
US tracker supplier Array Technologies has launched an enhanced version of its DuraTrack system that supports a two-row module format.
June 18, 2026
Sonnedix has received authorisation from Spain’s CNMC to operate as a licensed electricity trading and supply company in the country.
June 18, 2026
Data loss in PV project design can lead to inaccurate energy modelling and underperforming solar projects. Maksim Markevich examines how the industry can avoid these blind spots.

Upcoming Events

Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Solar Media Events
September 9, 2026
Schaumburg, Illinois
Media Partners, Solar Media Events
September 9, 2026