Ecoppia to deploy solar panel cleaning solutions for over 400MW of PV projects in India

Facebook
Twitter
LinkedIn
Reddit
Email
Image: Ecoppia

Ecoppia, developer of fully autonomous, water-free PV panel cleaning solutions, has been chosen by Fortum to deploy its platform across multiple projects in India, totaling 427MW of production capacity.

As part of this deal, Ecoppia will equip Fortum-developed projects at the Pavagada and Bhadla solar parks with its connected E4 solution. Ecoppia has already established quite a footprint within the Indian subcontinent, deploying nearly 2GW in production capacity in that region alone, while also boasting over 7GW in secured projects globally.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The E4 robot developed by Ecoppia for fixed-tilt solar installations supports both framed and frameless panels, while also adding no additional load to the panel surface. The cleaning solution, which was certified by First Solar, will be used to clean both crystalline modules and frameless modules at Fortum's sites.

Sanjay Aggarwal, managing director, India, at Fortum, said: “As we in Fortum drive the change towards a cleaner world, the Ecoppia water-free solutions are a perfect fit with our strategy. Now, we will be able to provide clean energy without exhausting water resources – ensuring solar energy production is both cost-effective and truly environment friendly. This is a natural next step towards sustainable & clean development, a joint vision shared with our partners UKCI (UK Climate Investments) & EAB (Elite Alfred Berg).”

Eran Meller, CEO of Ecoppia, added: “It's a great honor to extend our successful collaboration with Fortum to additional projects. We see Fortum as a true and visionary partner in advancing the solar industry towards full automation and lower, viable LCOE.”

Read Next

September 15, 2025
Norwegian energy firm Statkraft has agreed to divest a portion of its renewable energy portfolio to Serentica Renewables.
September 15, 2025
Vikram Solar has secured a contract to supply 200MW of modules to AB Energia, a domestic solar engineering, procurement, and construction (EPC) solutions provider. 
September 12, 2025
ACME Venus Urja has secured INR3.8 billion (US$43 million) to develop and construct a solar-plus-storage project in Barmer, Rajasthan.
September 10, 2025
Indian solar module manufacturer Vikram Solar reported a 79.7% year-on-year increase in revenue for the first quarter of FY26.
September 8, 2025
Vikram Solar has won a 336MW module supply agreement from L&T Construction for the 2.3GW Khavda solar park in Gujarat. 
September 4, 2025
India’s Goods and Services Tax (GST) Council, the joint forum of the Centre and States, has reduced the GST rate on renewable energy components from 12% to 5%. 

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines