Panasonic pulling out of solar production at Tesla’s Buffalo plant

February 26, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
In 2019, Panasonic said that it was transferring a 90% stake in its heterojunction intrinsic layer (HIT) solar cell technology and production plant in Malaysia to Chinese PV manufacturer, GS-Solar as part of wider collaboration on HIT production expansion and R&D activities. Image: Tesla

Updated: New York State has offered employees of Panasonic working at Tesla’s Gigafactory 2 plant in RiverBend, Buffalo assistance in finding new jobs as the Japanese electronics giant is expected to shut down solar panel operations at the facility.

Empire State Development Chair, Howard Zemsky said in a statement that Tesla was expected to find jobs within the Gigafactory 2 plant for as many Panasonic employees as feasible. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“While the New York State Department of Labor stands ready with its Rapid Response Team to ensure that any employees who are impacted by Panasonic’s decision are connected to opportunities and resources available in the region, Tesla has indicated that it intends to hire as many Panasonic employees as it can going forward,” said Zemsky. 

Panasonic’s plans

In 2019, Panasonic said that it was transferring a 90% stake in its heterojunction intrinsic layer (HIT) solar cell technology and production plant in Malaysia to Chinese PV manufacturer, GS-Solar as part of wider collaboration on HIT production expansion and R&D activities.

GS-Solar would become the principle owner and operator of Panasonic’s Malaysia plant, while a new company will be formed in Japan with GS-Solar to undertake all HIT R&D activities that will entail Panasonic’s existing R&D activities being separated from the Panasonic group. 

GS-Solar had separately announced in February 2019, and before the official decision by Panasonic to break ground on a 5GW manufacturing base in Jinjiang City. 

The first phase of the project is expected to be 2GW of heterojunction (HJ) solar cell capacity, with a RMB 5 billion (US$732 million) investment. GS-Solar is targeting 25% cell conversion efficiencies in the new production plant.

Panasonic’s former Malaysian plant would be able to supply Tesla the HIT cells it requires for its Tesla roof tile system ahead of GS-Solar’s ability to ramp production in China. The Malaysian HIT fab would also not be affected by the US quota system (before duties are imposed) for solar cells imported into the US. Panasonic had produced HIT cells and panels at Gigafactory 2.

Empire State Development Chair, Zemsky also noted that any job losses due to the pull out of Panasonic at Gigafactory 2 would not affect clauses in its agreements with Tesla as the company had exceeded employment plans.

“Tesla informed us that they have not only met but exceeded their next hiring commitment in Buffalo. As of today, Tesla said they have more than 1,500 jobs in Buffalo and more than 300 others across New York State. ESD will perform the necessary due diligence to verify the company’s data,” added Zemsky.

“This count does not include the Panasonic positions and — while their operations were co-located at RiverBend — there was no incentive package between the state and Panasonic. We understand that Panasonic has made a corporate decision to move away from global solar products, but this action has no bearing on Tesla’s current operations nor its commitment to Buffalo and New York State, according to Tesla,” added Zemsky.

Update

Panasonic has confirmed in a statement issued February 26 that the company would cease solar manufacturing at Buffalo, RiverBend site by the end of May 2020 and exit the facility by the end of September 2020.

Panasonic’s decision to cease all production at the plant was said to be part of the company’s broader streamlining of its global solar operations.
 
Panasonic said that it would providing any affected employees with a severance package that includes outplacement support that includes coordinating job fairs for affected Panasonic employees with Tesla, and Panasonic would be hosting a second job fair with other area employers to help support any employees who do not find employment with Tesla.

Shinichiro Nakajima, director of Panasonic’s Energy System Strategic Business said, “We are proud of what Panasonic has accomplished as a pioneer in the solar space and the significant role Panasonic employees in Buffalo have played in that success. “The decision to transition away from U.S. solar manufacturing in Buffalo aligns with our global solar strategy, our efforts to optimize development and production, and supports Tesla’s long-term plans to continue and expand its operations.”

The company also noted that it would continue to sell Panasonic branded solar panels to US customers through its own distribution network. 

Panasonic said that it would be integrating solar into its energy solutions business. The strategic shift supports the company’s offerings in this space including Home Energy Management System (HEMS)  solar modules, storage batteries, EcoCute heat pump systems, and EV chargers, et al. 

10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

October 16, 2025
US utility-scale solar additions grew by 56% in 2024, reaching 30GW from 2023’s 19GW and representing over 54% of all new electricity generation capacity added in the country last year.
October 15, 2025
Independent power producer (IPP) Geronimo has begun construction on it’s150MW solar project in Illinois and commissioned the 125MW PV project in Michigan.
October 15, 2025
Indian module manufacturer Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR6.89 billion (US$78 million).
Premium
October 14, 2025
OCI Holdings’ decision this week to buy a Vietnamese solar wafer facility to supply the US solar cell manufacturing industry makes clear the biggest vulnerability facing the sector today.
October 13, 2025
Korean chemical production firm OCI Holdings has acquired a 65% stake in a Vietnamese solar wafer production plant, intending to export solar wafers to the US.
October 13, 2025
Two Chinese state-owned energy enterprises have signed cooperation agreements on PV and wind power projects with Saudi companies, with the total contract value exceeding RMB30 billion (US$4.2 billion). 

Subscribe to Newsletter

Upcoming Events

Solar Media Events
October 21, 2025
New York, USA
Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK