Portugal’s solar campaign back on track as 700MW auction launches

June 8, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
Unlike last year's region-agnostic tender, this year's 700MW successor will exclusively target the southern regions of Alentejo and Algarve. Image credit: Cristiano Pinto

Portugal has now fired the starting pistol of a solar tender it had been forced to delay by the COVID-19 crisis, amid plans to declare the winners by the end of the summer.

The 700MW solar auction initially due to launch in the spring kicked off instead today (8 June 2020), with a Portuguese Energy Ministry spokesperson telling PV Tech that applications will be accepted until 31 July 2020.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Having launched the two-month qualification phase today, the government expects actual, hard bidding to begin around the last week of August, the spokesperson said, adding: “The auction solar winners are likely to be known in the very first days of September.”

The tentative timetable emerges after Portugal postponed the tender in late March, amid efforts to contain the COVID-19 pandemic. At the time, Energy state secretary João Galamba told PV Tech the country was “ready to go” but had decided to “pause for the general situation to calm down”.

In the intervening weeks, details have emerged around how Portugal will assign the solar contracts across three modalities, including (see below) two solar-only categories already rolled out for last year’s tender and a third basket open to projects featuring a storage element.

In late May, new government documents indicated that the plan is to put forward 12 contract lots for bidders. In the first of three categories, bidding will start at an initial maximum price of €41.54-41.73/MWh (US$46.37-46.58/MWh).

The figure marks a drop on the €45/MWh ceiling prices Portugal had set for its 1.15GW solar tender in 2019, which ended up producing individual tariffs of €14.76/MWh. The number has since been described as a global solar cost milestone but also a figure PV players “cannot survive on”.

The inner workings of Portugal's 700MW solar auction

1 – Having launched today (8 June 2020), the upcoming tender features the following three modalities:

  • Solar developers bidding for 15-year fixed-price PPAs (this is the category France's Akuo Energy was part of when it scored the €14.76/MWh tariff)
  • Solar developers accepting to pay in return for the right to produce at market prices, also for 15 years (this is the category Iberdrola was part of as it reaped 149MW in contracts)
  • Storage developers: According to state secretary Galamba (see here for full explanation), the new modality will work as a “quid pro quo” insurance-type scheme. Storage developers will receive from the system an annual fixed price per MW installed; by competing in the auction, they will bid down the prices they are prepared to receive. In return, they will insure the system against price rises beyond a certain level, compensating it when market prices climb over strike prices.

2 – Where last year's 1.15GW auction was open to projects all across the country, this year's 700MW successor will exclusively target the southern regions of Alentejo and Algarve.

3 – According to Galamba, the government's plan as of late March 2020 is that the 700MW solar tender will be followed by another exercise of 500MW (the figure is indicative) towards the end of this year.

Read Next

December 3, 2025
German research institute Fraunhofer ISE has launched a project to explore how medium-voltage technology can make material-intensive solar components more efficient and cost-effective.
December 3, 2025
The US Department of Energy (DOE) has renamed the National Renewable Energy Laboratory (NREL) the National Laboratory of the Rockies.
December 3, 2025
The Australian Renewable Energy Agency (ARENA) has announced up to AU$151 million (US$98 million) in conditional funding for Sunman Energy to establish a 500MW per annum solar module manufacturing facility in the Hunter Valley, New South Wales (NSW).
December 2, 2025
Swiss electrification specialist ABB has acquired solar PV inverter and power conversion system (PCS) producer Gamesa Electric for an undisclosed sum.
December 2, 2025
Australia's NEM faces a fundamental transformation as solar PV generation and BESS drive the transition to a low-emissions energy system.
December 1, 2025
Victoria's first state-owned solar-plus-storage project has reached a major construction milestone, with the installation of all 212,296 PV modules at the SEC Renewable Energy Park in Horsham, Australia.

Upcoming Events

Upcoming Webinars
December 4, 2025
2pm GMT / 3pm CET
Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy