US ROUND-UP: Cubico makes maiden MISO deal, US Solar Fund completes solar build-out

November 24, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
The Arlington Valley Solar Energy II project (pictured) will transfer to Capital Dynamics. Image: LS Power.

A round-up of the latest news from the US solar market, including developments from Cubico and US Solar Fund.

 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Cubico acquires 270MW US portfolio from RES

24 November 2020: Renewables investor Cubico Sustainable Investments has completed the acquisition of two solar projects from developer RES, totalling 270MW of generation capacity.

The projects – Delta’s Edge and Crossett – are both underpinned by long-term power purchase agreements with regional cooperative utilities, and will be constructed by RES. They are slated to begin commercial operations in 2022, with financial close expected in Q1 2021.

The projects represent Cubico’s first acquisition within the Midcontinent Independent System Operator (MISO) region.

“We are happy to support these local communities through economic development, by investing in greenfield clean energy projects. The acquisition of Delta’s Edge and Crossett is complementary to our existing solar investments across the southeast US and Texas,” Lance Jordan, senior VP of origination and execution at Cubico, said.

 

US Solar Fund energises Utah solar project, completing fund’s build-out program

23 November 2020: London-based US Solar Fund has celebrated the completion of its solar build-out programme by completing its 128MWdc Milford Plant project in Utah.

The project, which came onstream last week, was completed on time and under-budget, US Solar Fund said, confirming that now all 41 of its portfolio projects was operational and generating revenue.

The Milford Plant saved construction and development costs of around US$4 million, the fund said, while the earlier-than-expect commercial operations date will provide additional revenue of around US$1 million.

“I am delighted that we have reached the point where all the company’s solar plants are in operation and generating power. This puts us firmly on track to pay and cash cover the full target dividend of 5.5 cents per share in 2021. We look forward to growing the company and delivering on the investment mandate,” Gill Nott, chair at US Solar Fund, said.

 

Capital Dynamics completes LS Power project acquisition

19 November 2020: Asset management firm Capital Dynamics has completed the acquisition of three utility-scale solar projects from developer LS Power.

The deal, previously disclosed in September, will see Capital Dynamics acquire a portfolio of projects with a total combined generation capacity of 316MWdc in states including California, Arizona and Delaware.

The portfolio includes:

  • 100% ownership of the Centinela Solar Energy project, a 252MWdc array in California
  • 100% ownership of the Dover Sun Park, a 11MWdc project in Delaware
  • A 30% stake in Arlington Valley Solar Energy II, a 175MWdc array in Arizona.

“With the addition of these high-quality assets, our team further cements our position as the largest private owner of solar assets in the United States, with a fleet exceeding 3.5 gigawatts (GWdc),” Tim Short, managing director of clean energy infrastructure at Capital Dynamics, said.  

Read Next

December 10, 2025
The US SEIA has named board chair Darren Van’t Hof as interim president and CEO, to begin work 20 January 2026.
December 10, 2025
The global utility-scale solar PV sector has exceeded the threshold of 1TW of operating capacity, according to Wiki-Solar.
December 10, 2025
The US solar industry registered its third-best quarter with 11.7GW of new capacity installed in the third quarter of 2025.
December 10, 2025
The average price of several types of solar PV modules remained stable in Europe in November, according to sun.store.
December 9, 2025
Indian solar PV manufacturer Waaree Energies has signed a 288MWp solar module supply deal with US project developer Sabanci Renewables.
December 8, 2025
Norwegian renewable energy firm Scatec has signed equity deals for a massive solar-plus-storage project in Egypt and begun operations at a site in South Africa.

Upcoming Events

Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA