Order focus: Sunfilm completes delivery for Weinmann Aach roof installation

Facebook
Twitter
LinkedIn
Reddit
Email

Sunfilm released that it has completed the delivery of its thin-film tandem junction modules for the 700kWp Weinmann Aach rooftop installation in Dornstetten, Black Forest, Germany. This is said to be the largest roof installation of its kind in Germany and was contracted by Sunova AG.  Sunfilm imparted their module Model Q, the smallest out of five available formats, for the project.

Although the roof installation will be battling adverse weather conditions, such as strong winds and heavy snow loads, Sunfilm rests assured that the Sunova MCG 2.1 system will exceed expectations. It has proven stability in lab, wind tunnel and field tests. The PV power station is expected to provide 2.4 times more power per year than Weinmann used in 2008 – ensuring that as the company expands, their increase in power demands can be met.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

September 4, 2026
Victoria's SEC has connected the 119MW solar PV plant component of its SEC Renewable Energy Park in Australia to the grid for the first time.
Premium
September 3, 2026
PV Tech Premium speaks to IEEFA's Jonathan Bruegel about how renewable PPAs have become a key part of European energy resilience.
September 3, 2026
Scientists in Japan have developed a new approach which they claim can improve the durability of tin-based perovskite solar cells.
September 3, 2026
In this week's PV Chart of the Week, we look at disparity between announced and operational cell and module manufacturing capacity in the US across PERC, TOPCon and HJT.
September 3, 2026
PVFARM launches RE PILOT platform to optimise utility-scale solar and co-located solar-plus-storage projects.
September 3, 2026
PERC, TOPCon or HJT? In the fourth of five articles this week, Moustafa Ramadan and Joe Hennessy of PV Tech Research examine emerging technology trends in US solar cell and module manufacturing.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK