Polyera claims 9.1% power conversion efficiency on its OPV cell

February 1, 2012
Facebook
Twitter
LinkedIn
Reddit
Email

According to Polyera, the Newport Corporation’s PV cell lab has confirmed that Polyera’s polymer/fullerene OPV cell has achieved a 9.1% power conversion efficiency with an inverted bulk heterojunction architecture using ActivInk PV 2000 semiconductor material. The company said its active layer materials are able to be deposited using a wider range of film thickness without lower cell efficiency, which is said to improve yields and simplify manufacturing.

“We have concentrated our [solar] work on the chemistry of these materials and found a new way to design and combine the active layer building blocks to maximize certain optical and electrical properties”, says Antonio Facchetti, founder and CTO of Polyera. “These latest results bring us a significant step closer to enabling true commercialization.” The company noted that it will be debuting a series of OPV cell active-layer inks, which will be commercialized under the trade name ActivInk PV.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Read Next

February 20, 2026
NTPC has commissioned 165MW of solar capacity at its 1.25GW Khavda-II solar project in Gujarat.
February 20, 2026
Microsoft met all of its electricity demand with renewables in 2025 and has said it will continue to do so through 2030.  
Premium
February 20, 2026
In the last two weeks, both Shoals and Voltage have declared victory in an eBOS patent infringement case, following a ruling from the US ITC.
February 20, 2026
Origis Energy has commissioned three 145MW Swift Air solar facilities in Ector County, Texas, to supply power to Occidental’s operations in West Texas. 
February 19, 2026
SolarPower Europe has released two new technical due diligence reports for utility-scale hybrid solar PV and battery energy storage system (BESS) projects.
February 19, 2026
Statkraft and 3E analysed 64 utility-scale PV plants, representing 2.1GWp DC capacity, with datasets spanning six months to five years.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain