Reports: Alfanar Energy signs PPA for 50MW solar plant in Egypt

May 9, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
Source: Flickr/Dennis Jarvis.

Saudi Arabia’s Alfanar Energy has signed a PPA with the Egyptian Electricity Transmission Company (EETC) for the development of a 50MW solar plant in Egypt, according to local reports.

The PPA was signed as soon as the 50MW project, under the country’s feed-in tariff (FiT), reached financial closure. The plant will be located at the proposed 1.8GW Benban solar complex in the Aswan province.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The US$100 million project is being financed by the European Bank for Reconstruction and Development (EBRD) and the Islamic Development Bank (IDB), and is one of Egypt’s first utility-scale solar plants.

In a Daily News Egypt report, director of Alfanar’s renewable energy projects in Egypt, Mohamed Abdel Karim, said the Saudi firm paid the third installment of the cost-sharing agreement after an increase of its value by about 35%.

Alfanar has reportedly allocated US$200 million towards two new renewable energy projects in Egypt, with a total capacity of 100MW through the second phase of the FiT.

Follow all PV Tech's coverage of the Egyptian solar market here

Read Next

April 10, 2026
Q&A: Sarah Montgomery, founder & CEO of Infyos, gives her take on the rise of co-location and growing tension in Europe's solar market.
April 10, 2026
The California Public Utilities Commission (CPUC) has issued a proposed decision rejecting a solar industry-backed Net Value Billing Tariff (NVBT) for community solar programmes, and instead advancing a compensation framework based on the Avoided Cost Calculator (ACC).  
April 10, 2026
Singapore-based renewables firm Levanta Renewables has signed an engineering, procurement and construction (EPC) contract with China Energy Engineering Group (CEEC) for a solar-plus-storage project in the Philippines.
April 10, 2026
India has become the third-largest country by installed renewable energy capacity, reaching 274.68, with over 150GW of solar PV capacity, according to statistics from the Ministry of New and Renewable Energy (MNRE).
April 10, 2026
Array Technologies will deploy its OmniTrack terrain-following tracker system at a 260MW solar PV project being developed by Turkish company Pekintas.
Premium
April 10, 2026
Despite PV’s maturity, a new paper argues that its growing global significance makes ongoing research essential.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland