The Bankruptcy Court overseeing Solyndra's insolvency has assigned Jones Lang LaSalle to undertake the sale of its manufacturing plant in Fremont, California. The 450,000-square-foot manufacturing facility was said to be designed to exceed California seismic standards and can be operating immediately following a seismic event, though not at the levels created by the current solar industry shakeout.
Additional information on the building for sale may be found here.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free