Brazil’s energy agency EPE has registered 574 solar PV projects, totalling 18,352MW in capacity, for it’s A-4 Reserve energy auction that will be held in December.
Single-axis solar tracker manufacturer Soltec announced Wednesday that it is supplying 38MW of solar trackers to the Assuruá PV power plant in the Brazilian state of Bahia.
Ciel & Terre Brasil, a subsidiary of French floating PV specialist Ciel & Terre, has completed Brazil’s first floating solar project, standing at 304kW capacity on a rainwater accumulation pond at Fazenda Figueiredo, Cristalina, in the state of Goias.
Brazil’s energy agency EPE has set an 18 December date for the A-4 energy auction, which includes the potential of 20-year PPAs for wind, solar and biomass along with 30-year PPAs for hydro.
Solar tracker firm Soltec is supplying single-axis tracker equipment to Engie subsidiary Solairedirect’s 158MW Paracatu solar PV power plant in Minas Gerais, southeastern Brazil.
Brazil’s energy agency ANEEL has cancelled nine solar projects totalling 249.7MW of capacity and 16 wind farms with a combined capacity of 307.7MW in its first ever de-contraction auction.