Veeco announces Q209 and first six months financial results

Facebook
Twitter
LinkedIn
Reddit
Email

Veeco Instruments announced its financial results for the second quarter and six months ended June 30. Veeco said it is “on-track” with cost and workforce reduction plans and outsourced manufacturing initiatives. This is apparently due to solid performance in accounts receivable, inventory management and other operating items.

The company’s second quarter orders totaled $99 million; this is up 86% sequentially from the $53 million reported in the first quarter. LED and solar orders were $57 million, which is 58% of the total, thereby doubling sequentially as LED manufacturers ramp production for TV and laptop backlighting applications.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Metrology orders were $23 million (23% of total), up 38% sequentially due to new product traction, particularly for the Dimension Icon and BioScope Catalyst AFMs, and some improvement in scientific research spending.

Veeco also received several orders for its TurboDisc metal organic chemical vapor deposition (MOCVD) systems from key Korean and Taiwanese LED manufacturers in this quarter as well as recording that data storage orders had improved 147% sequentially to $19 million (19% of total), with hard-drive customers resuming both technology and capacity purchases. Veeco also received orders for four of its NEXUS CVD Systems.

John R. Peeler, Veeco’s CEO, commented, “From a revenue and loss perspective, the second quarter remained challenging, but was within our guidance range and was an improvement from the first quarter of 2009.”

“We are pleased with Veeco’s accomplishments during what has been a difficult first half of 2009. We swiftly restructured the company, while remaining focused on meeting our customers’ next-generation technology and product requirements. Although cautious about overall economic conditions, we are encouraged by the sequential bookings improvement in all three businesses. Veeco’s backlog at June 30, 2009 was $160 million.”

Veeco’s third-quarter 2009 revenues are forecast to be between $80-88 million.

Read Next

June 10, 2026
Australia leads the world in residential rooftop solar, but its commercial and industrial sector has deployed only 5.6GW.
June 9, 2026
Ark Energy has been granted approval by AEMO and Transgrid to connect its 435MW Richmond Valley solar-plus-storage project to the NEM.
June 9, 2026
Revolve Renewable Power is acquiring a 125MW portfolio of utility-scale solar development projects in the US.
June 9, 2026
Zelestra has signed a long-term power purchase agreement (PPA) with Meta for the 180MWdc Palmera Solar Plant in Freestone County, Texas.
June 9, 2026
A US Federal judge has revoked a law preventing solar PV and wind projects from qualifying for tax credits by committing 5% of the project’s value.
June 9, 2026
As solar deployments are set for a record year in the US, module supply, quality, and reliability will be key topics of conversation at PV ModuleTech USA 2026.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026