PV installation red tape in Greece reduced

Facebook
Twitter
LinkedIn
Reddit
Email

A common criticism of installing PV systems, large and small in Greece has been the bureaucratic red tape that had cased many projects to be delayed by several years, limiting the appeal of the country’s FiT and resulting in a standstill for most projects. According to BSW-Solar and PV LEGAL, concerted efforts to unwind the red tape, have had some significant success recently.

The trade association said that PV power plant developers no longer need to obtain a ‘production’ licence before starting a project, which could take 2-years due to the previous bureaucratic barriers rather projects could now be started immediately

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“This administrative requirement had in the past led to a standstill in the Greek PV market,” noted Jörg Mayer director of the BSW-Solar. “Plant engineers no longer [have to] wait up to two years for a license in order to start building, but can start right away.”

In Slovenian the local solar trade association in cooperation with the government have eliminated the need for a building permit for smaller plants, according to PV LEGAL. A new legally binding permit freedom agreement has been agreed.

In Portugal it was noted that the approval process for solar power systems on electronic submission has been changed to an online system, reducing complexity and speed of acceptance. “The process is faster, more transparent and cost-efficient,” added Mayer.

Read Next

June 10, 2026
Australia leads the world in residential rooftop solar, but its commercial and industrial sector has deployed only 5.6GW.
June 9, 2026
Ark Energy has been granted approval by AEMO and Transgrid to connect its 435MW Richmond Valley solar-plus-storage project to the NEM.
June 9, 2026
Revolve Renewable Power is acquiring a 125MW portfolio of utility-scale solar development projects in the US.
June 9, 2026
Zelestra has signed a long-term power purchase agreement (PPA) with Meta for the 180MWdc Palmera Solar Plant in Freestone County, Texas.
June 9, 2026
A US Federal judge has revoked a law preventing solar PV and wind projects from qualifying for tax credits by committing 5% of the project’s value.
June 9, 2026
As solar deployments are set for a record year in the US, module supply, quality, and reliability will be key topics of conversation at PV ModuleTech USA 2026.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026