BlueChip Energy signs 40MW power purchase agreement

Facebook
Twitter
LinkedIn
Reddit
Email

BlueChip Energy (BCE), a fully-integrated solar energy provider for residential, commercial, government and utility applications, has signed a power purchase agreement (PPA) to supply Progress Energy Florida with renewable solar photovoltaic power from the Sorrento Eagle Dunes Solar Farm, a 40 megawatt utility-scale solar PV facility the company is developing in Central Florida.

The solar farm project, located in Lake County, Florida, will have a total capacity of 40MW and an annual generation of more than 64,000,000 kilowatt-hours. This is equivalent to the annual energy use of roughly 8,000 area homes. The Sorrento project will be the largest private solar plant in the State of Florida and one the largest solar PV projects in the United States. The annual power generated from the solar plant will displace over 25,000 metric tons of carbon dioxide per year.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

“This large-scale solar project has the distinct advantage of being near the population base that it will serve. Combined with the BCE vertically integrated business model, the project will demonstrate renewable energy at close to grid parity. Private solar plants are key to the future for helping help Florida and America meet clean energy goals,” said Demitri Nikitin, President and CEO of the company.

The solar farm will be a ground mount system covering 140 acres of open field. The solar farm will be built in stages, starting with 10MW in 2012. BCE will build the plant using 174,000 monocrystalline and polycrystalline PV solar panels from Advanced Solar Photonics (ASP) and other leading manufacturers. BCE is providing its own project development, engineering, procurement, and construction capabilities.

BCE recently purchased the land to enhance the “bankability” of the project and is currently applying for the applicable zoning approvals. The necessary geo-technical, drainage, and environmental studies have been completed. The adjacent land areas allow for up to 100MW of additional solar farm development.

Read Next

May 22, 2025
US energy utility AES has signed two long-term power purchase agreements (PPAs) with technology giant Meta for two solar PV projects in the US states of Texas and Kansas.
May 22, 2025
The New York State Energy and Research Development Authority (NYSERDA) has contracted 2.2GW of solar PV across 18 projects.
May 22, 2025
SMA Solar will begin local assembly of power systems for large-scale solar and energy storage systems in the US.
May 22, 2025
Prefabricated solar structure provider 5B has become the first recipient of the Australian government’s AU$1 billion Solar Sunshot Program, securing up to AU$46 million for its “Maverick” automated solar deployment system.
May 21, 2025
There is potential for cPPAs to deliver the energy transition, according to speakers at the Renewables Procurement and Revenue Summit.
May 21, 2025
US PV module manufacturer Silfab Solar has acquired a patent portfolio for back-contact (BC) solar cells from solar research firm EnPV.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia
Solar Media Events
September 16, 2025
Athens, Greece