European PV recycling centre to cease waste operations

Facebook
Twitter
LinkedIn
Reddit
Email

A Paris-based centre for recycling solar modules has abandoned its operations in PV waste management, citing increasingly difficult regulatory and market conditions.

The European Centre for the Recycling of Solar Energy (CERES) said it had ceased all PV waste activities as of 6 September and would instead focus on research into the field of PV recycling.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The non-profit body said the “increasingly stiffer” environment for PV production in Europe and growing complexities in the market for PV waste management were decisive factors in its decision.

It pledged to expand its commitment to ongoing R&D projects, including research into “cradle-to-cradle” PV design.

Serge Besanger, CERES’ president, said: “CERES started out as a research platform for PV module recycling. This is where we are strong and where we can play a pivotal role in the industry.”

PV Cycle, the pan-European take-back and recycling scheme, will assume all recycling obligations for current CERES members, meaning the disposal and treatment of their modules will be free-of-charge for module owners until December 2013.

CERES was founded in 2011 with the goal of taking back and recycling used PV modules and PV production scrap.

PV modules have been included in the European Waste Electrical and Electronic Equipment Directive (WEEE) since last year. This obliges the 'producers' of PV modules to take back or recycle modules for free, though there is some debate about whether producers are importers or manufacturers.

Read Next

October 15, 2025
Wood Mackenzie has warned of a supply bottleneck as the renewable energy shift drives a spike in global copper demand over the next decade.
October 15, 2025
The average price of a solar PPA signed in North America increased 4% between the second and third quarters of 2025, according to LevelTen.
October 15, 2025
A report by IRENA and others has highlighted the need for yearly renewable energy deployments to almost double between now and 2030.
October 15, 2025
Independent power producer (IPP) Geronimo has begun construction on it’s150MW solar project in Illinois and commissioned the 125MW PV project in Michigan.
October 15, 2025
Ciel & Terre has launched a new floating PV structure designed to address the increasingly large scale of floating solar projects.
October 15, 2025
Indian module manufacturer Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR6.89 billion (US$78 million).

Subscribe to Newsletter

Upcoming Events

Solar Media Events
October 21, 2025
New York, USA
Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK