Germany awards 2.6GW capacity in oversubscribed ground-mount PV auction

Facebook
Twitter
LinkedIn
Reddit
Email
Aerial view of a solar PV plant from Uniper
Bids were awarded at low prices, ranging between 3.99 cents/kWh and 4.88 cents/kWh. Image: Uniper.

Germany’s latest public auction for ground-mounted solar PV capacity ended “significantly oversubscribed”, according to the German electricity regulator, the Bundesnetzagentur.

Companies collectively submitted 420 bids for 3,839MW worth of capacity bids to the auction, which had a total allotted capacity of 2,625MW; 271 bids were successful, with a combined capacity of 2,638MW.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Bids were awarded at low prices, ranging between 3.99 cents/kWh and 4.88 cents/kWh. The volume-weighted average price was 4.66 cents/kWh.

Bavaria was awarded the most capacity of any state – 607MW across 85 bids – followed by Brandenburg (367MW, 24 bids) and Lower Saxony (315MW, 31 bids).

“The auction was again very well subscribed, with a consistently high level of competition and a further decrease in award prices,” said Klaus Müller, president of the Bundesnetzagentur. “The Bundesnetzagentur is very pleased about developments in this field of solar generation. These installations are all controllable and can adapt the amount of electricity they generate to the demand in the market.”

These auction results continue the trend of falling prices and high demand in German public solar auctions. The last ground-mount tender, which closed in February, registered the lowest prices in the scheme since 2019 – 4.76 cents/kWh; a landmark which the most recent round surpassed.

The February auction was also almost twice oversubscribed, as was the previous iteration in September and the round in April 2024.

The government changed the requirements for ground-mount solar tenders in its reforms to the Solarpaket programme. The changes, which were announced in April last year, widened the net of usable land for solar projects and proposed to the raise the upper threshold of tendered project capacity from 20MW to 50MW.

Germany’s so-called “innovation tenders” for solar-plus-storage projects and its rooftop solar tenders have also been oversubscribed.

These results reflect strong demand for PV in the country. The Bundesnetzagentur said that Germany had surpassed 100GW of cumulative solar PV capacity in February this year, and it continues to top European lists for annual installations.  

2 February 2027
London, UK
Returning in 2027 for its 14th edition, Solar & Storage Finance Europe will bring together the brightest minds representing funds, banks, developers, utilities, government and industry across Europe and the UK on a programme that is solutions-focused from top to tail. The event is designed to enable leaders at the forefront of solar and storage investment and deployment in Europe to scale, learn and land themselves industry defining partnerships.

Read Next

November 17, 2026
Quality defects the solar industry resolved more than a decade ago are resurfacing as PV manufacturing geographies shift, according to Cherif Kedir, CEO of the Renewable Energy Test Center (RETC).
November 17, 2026
German solar energy research institute ISC Konstanz has manufactured its first TOPCon solar cell at its new research laboratory.
November 17, 2026
The latest edition of PV Tech Power leads with a special report that takes you behind the scenes of America’s burgeoning PV manufacturing sector.
November 17, 2026
Chinese PV manufacturer Trina Solar is among four new shareholders €15 million in the French start-up HoloSolis planned 5GW module plant.
November 17, 2026
LONGi will supply 176MW DC of its Hi-MO 9 back contact (BC) solar modules to OX2's Muswellbrook solar-plus-storage project at a former coal mine in New South Wales (NSW), Australia.
November 16, 2026
Vikram Solar secured 1.7GW in new orders in Q2 but saw both revenues and profits fall as the company faced procurement and pricing headwinds.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye