Germany awards 2.6GW capacity in oversubscribed ground-mount PV auction

April 23, 2025
Facebook
Twitter
LinkedIn
Reddit
Email
Aerial view of a solar PV plant from Uniper
Bids were awarded at low prices, ranging between 3.99 cents/kWh and 4.88 cents/kWh. Image: Uniper.

Germany’s latest public auction for ground-mounted solar PV capacity ended “significantly oversubscribed”, according to the German electricity regulator, the Bundesnetzagentur.

Companies collectively submitted 420 bids for 3,839MW worth of capacity bids to the auction, which had a total allotted capacity of 2,625MW; 271 bids were successful, with a combined capacity of 2,638MW.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Bids were awarded at low prices, ranging between 3.99 cents/kWh and 4.88 cents/kWh. The volume-weighted average price was 4.66 cents/kWh.

Bavaria was awarded the most capacity of any state – 607MW across 85 bids – followed by Brandenburg (367MW, 24 bids) and Lower Saxony (315MW, 31 bids).

“The auction was again very well subscribed, with a consistently high level of competition and a further decrease in award prices,” said Klaus Müller, president of the Bundesnetzagentur. “The Bundesnetzagentur is very pleased about developments in this field of solar generation. These installations are all controllable and can adapt the amount of electricity they generate to the demand in the market.”

These auction results continue the trend of falling prices and high demand in German public solar auctions. The last ground-mount tender, which closed in February, registered the lowest prices in the scheme since 2019 – 4.76 cents/kWh; a landmark which the most recent round surpassed.

The February auction was also almost twice oversubscribed, as was the previous iteration in September and the round in April 2024.

The government changed the requirements for ground-mount solar tenders in its reforms to the Solarpaket programme. The changes, which were announced in April last year, widened the net of usable land for solar projects and proposed to the raise the upper threshold of tendered project capacity from 20MW to 50MW.

Germany’s so-called “innovation tenders” for solar-plus-storage projects and its rooftop solar tenders have also been oversubscribed.

These results reflect strong demand for PV in the country. The Bundesnetzagentur said that Germany had surpassed 100GW of cumulative solar PV capacity in February this year, and it continues to top European lists for annual installations.  

3 November 2026
Málaga, Spain
Understanding PV module supply to the European market in 2027. PV ModuleTech Europe 2026 is a two-day conference that tackles these challenges directly, with an agenda that addresses all aspects of module supplier selection; product availability, technology offerings, traceability of supply-chain, factory auditing, module testing and reliability, and company bankability.

Read Next

March 27, 2026
The US International Trade Commission (ITC) has begun an investigation into tunnel oxide passivated contact (TOPCon) solar products in the US, following a complaint by US thin-film module manufacturer First Solar.
March 27, 2026
Two module production facilities in China have been awarded the first Supply Traceability Standard certifications by Europe’s Solar Stewardship Initiative (SSI).
March 27, 2026
Axpo will supply 83GWh of solar to McDonald’s under a 10-year PPA, while EDP adds 90MW with two Navarra PV plants.
March 27, 2026
New system-level modelling from the Australian Centre for Advanced Photovoltaics (ACAP) has revealed that achieving ultra-low-cost solar targets could create a 2,000GW-scale solar PV market in Australia.
March 26, 2026
French independent power producer Qair has signed a power purchase agreement with Brazilian LPG distributor Ultragaz for the Bom Jardim solar PV project.
March 26, 2026
More than 70% of global solar manufacturing facilities exhibited “major” or “critical” defects in 2025, according to a new report from Intertek CEA.

Upcoming Events

Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland