The 14.5MW Sekdoorn project was completed by BayWa r.e. in just eight weeks. Image: BayWa r.e.

In August 2019, a team at BayWa r.e. began construction of its 14.5MWp Sekdoorn floating solar project near the town of Zwolle in the Netherlands. Just eight weeks later, it was complete, 40,000 solar panels afloat on the former sandpit.

The project was the company’s third floating solar farm in the country, built with Dutch subsidiary GroenLeven, following on from the 2MWp Weperpolder project in Oosterwolde, and the 8.4MWp Tynaarlo plant in the province of Drenthe. With 25MWp already built in the Netherlands in less than one year, and its biggest project yet, the 27MWp Bomhofsplas partway through construction, BayWa r.e. now claims to be one of the biggest floating solar developers in Europe.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The secret to its rapid build-out is a bespoke floating platform for the modules, designed by German engineering company Zimmerman PV Stahlbau. The decision to design an entirely new floating plant concept came about following careful consideration of those already on the market, explains Franz Krug, project manager of Zimmerman: “We found that that other structures all look nearly the same, so they had the same advantages, but also the same disadvantages.”

The Netherlands was chosen as the location for the company’s first floating PV projects since BayWa r.e’s partner company GroenLeven had already secured tariffs for installation on various lakes. The Dutch feed-in tariff (SDE+) is relatively high, meaning that there was still a working business model in the Netherlands for floating PV despite the higher cost of the floating installation compared to ground-mounted systems.

The partners developed and finessed the resulting ‘Zim Float’ system in around 18 months, with BayWa r.e. bringing its highly standardised electrical concept from ground-mounted projects to the water. It also prepared the layout of the plant, and the electrical concept from the panels to the injection point to the grid.

System anatomy

The so-called Zim Float platforms are square-shaped solar panel boats, with Huawei inverters floating alongside. The system also integrates maintenance walkways, cable ducts, wave barriers and a floating transformer station. The design makes it highly stable, improving its lifetime and easing maintenance.  

The system’s stability is the main difference between the Zim Float system and others on the market, explains Edgar Gimbel, head of power plant engineering at BayWa r.e. “We built a special boat, which is 12 modules packed in two floaters on a steel frame, which is very stable. Other systems on the market all have one floater on one module, which connect floater by floater, making them very flexible,” he says.

The electrical components are fully integrated into the floating platform, and meet all regulations related to the installation of electrical systems. A grounding system protects from electrical failures, while all cables and components are certified for use in water. BayWa has VDE certification (VDE-PB-0016-2:2016-11) for electrical safety and energy yield, installation quality and planning compliance for solar farms. The VDE Institute has also certified BayWa installation of floating power plants and electrical systems on the water.

“We are 100% safe on the electrical side. Nobody else in the market has this yet,” says Gimbel.

Krug adds: “Floating solar is quite young technology and for our first project we wanted the verification of a third party, that what we developed fitted with VDE, the market standard.”

The cabling design is kept completely out of the water, hidden under the subconstruction of the floating boats, so that cables are protected from the sun, and have only minimum contact with the water. This guarantees a longer life, as well as easy maintenance. The transformer station is also integrated into the floating system and is VDE certified.

Image: BayWa r.e.

Speed of construction

The system is built onshore, including the floaters, steel frame, modules and cabling. Up to nine of these “boats” are then attached to together in a kind of “roller conveyor”, after which the system is floated out onto the water row by row. A small motorboat is then used to take each row out to its final location on the water.

Prefabricating the system onshore is another key difference to other systems. Typically, these are partly constructed onshore, where modules are attached to floats, but installation of cabling then occurs on the water.

“Prefabrication makes it much easier to install, we are able to build up to 1MW per day, which is roughly 2,700 modules. It’s like building a car in a factory, it’s a lot of automised stuff,” Gimbel says.

He is so confident in the system that he is predicting that the 27MWp Bomhofsplas project, also in Zwolle, will be complete in less than two months.

This is an extract of an article first published in Volume 22 of PV Tech Power. The full article can be read here, or in the full digital copy of PV Tech Power 22, which can be downloaded for free here.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 10, 2024
Dallas, Texas USA
Solar Media Events
April 17, 2024
Lisbon, Portugal
Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Napa, USA