Hecate Energy’s 100MW PV project in New Mexico selected by El Paso Electric Company

January 2, 2020
Facebook
Twitter
LinkedIn
Reddit
Email
Once completed, the Santa Teresa solar project is projected to supply enough electricity to power approximately 40,000 homes with emission free electricity. Image: Pedro Szekely / Flickr

Hecate Energy’s proposed 100MW Santa Teresa solar project has been selected by El Paso Electric Company (EPE) as part of a 350MW solar and storage RFP process designed to add new clean resources to the EPE system. 

Pending regulatory approvals, the project is anticipated to be in service by May 2022. It will be developed in Santa Teresa, New Mexico. EPE and Hecate have already entered into a long-term PPA for the output from the project. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The added generation from the 100MW installation will help EPE meet the 2022-2023 summer peak season and replace less efficient gas-fired generation as older units are retired.

Alex Pugh, Hecate's manager of development, said: “We are very pleased to be working with El Paso Electric to supply clean, emission-free electricity to power the increasingly electrified lives of EPE customers for decades to come.”

EPE's interim CEO Adrian J. Rodriguez added: “Over the last year we have continued seeing growth in our customer base by approximately 7,000. Additionally, because of falling renewable energy prices, and changing customer expectations on how they receive their energy, we are able to offer more sustainable solutions.  Today's announcement further underscores our responsibility to both increase and enhance our power generation capability while simultaneously meeting our regional customers changing needs in a safe, clean, reliable, and cost-effective manner.”

Once completed, the Santa Teresa solar project is projected to supply enough electricity to power approximately 40,000 homes with emission-free electricity.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2027 and beyond.

Read Next

December 12, 2025
A roundup of three solar PV project financing stories from Australia, Texas and California, with updates from Potentia Energy, Origis Energy and Baywa r.e.  
December 12, 2025
Solar PV companies in the US are not waiting for guidance from the US Departments of the Treasury or Energy to act regarding Foreign Entity of Concern (FEOC), according to a survey conducted by Crux.
December 12, 2025
US solar PV module prices have stabilised at just over US$0.28/W in the three months to November 2025, according to Anza.
December 10, 2025
The US SEIA has named board chair Darren Van’t Hof as interim president and CEO, to begin work 20 January 2026.
December 10, 2025
The global utility-scale solar PV sector has exceeded the threshold of 1TW of operating capacity, according to Wiki-Solar.
December 10, 2025
The US solar industry registered its third-best quarter with 11.7GW of new capacity installed in the third quarter of 2025.

Upcoming Events

Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA