New high-efficient grinding machine for silicon ingots from Arnold offers shorter cycle-times

November 16, 2011
Facebook
Twitter
LinkedIn
Reddit
Email

For extremely high product quality and productivity for treatment of silicon bricks, Arnold Group has introduced the type 72/865 machine, which is a high-end combination of a surface and chamfering machine. Arnold claims that it now has a balanced production range in the grinding field with this high-end grinding machine which can serve the most different requests of customers. The improvements and further developments of this high-end grinding machine, 72/865, are also integrated in the surface grinding machine 72/860 and chamfering machine 72/852. Furthermore they influence the combination machine, now available as 72/855.

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Optimal yield for ingots and wafers is a key metric for cost reduction strategies. Reduction in material loss and material usage such as water consumption is required.

Solution

The new high-efficient grinding machine with four parallely mounted grinding aggregates is suitable for grinding of lateral surfaces and for chamfering of squared silicon workpieces in the formats of 125 x 125 millimeters and 156 x 156 millimeters with an automatic format change. The extremely sturdy machine construction guarantees an excellent machine angularity and an extremely high absorption. The machine processing parts are casted with mineral composite. A new development, the cooling water guidance with a pressure of up to 25 bar, is claimed to guarantee a balanced process cooling and hence reduces the water consumption by nearly one third. This high-end grinding machine is claimed to pave the way to ‘Zero Error’ strategies demanded by the wafer manufacturers. A process capability of >1,67 Cpk at a tolerance of +/-0,05 millimeters on a permanent basis is claimed.

Applications

Silicon ingot grinding requirements.

Platform: Current production and process data are stored, visualized and analyzed with the Arnold remote process analysis tool Arpat and are the basis for the continuous optimization of production and process parameters. The software tool Arpat, developed by Arnold, is a data base and controllable via Web-Browser and is an available option for all Arnold machines.

Availability

September 2011 onwards.
 

Read Next

April 22, 2026
US independent power producer Geronimo Power has begun commercial operations at its 270MW Blevins solar plant in Falls County, Texas.
April 22, 2026
Botswana has started construction on its 500MW Maun solar-plus-storage project, which will begin commercial operations in 2029.
April 22, 2026
The UK government, through the Department for Energy Security and Net Zero, has set a series of measures to decouple the electricity prices from gas market volatility.
Premium
April 22, 2026
The European Commission (EC) is reportedly “very resolved to take harsh steps” in its enforcement of cybersecurity laws in the solar energy sector.
April 22, 2026
Australia has opened its first dedicated research facility for solar module recycling at UNSW, officially launching on 21 April.
April 21, 2026
A group of non-profit organisations is petitioning California’s high court to review a recent decision that upheld the California Public Utilities Commission (CPUC) net energy metering 3.0 (NEM 3) policy for rooftop solar installations.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
March 9, 2027
Location To Be Confirmed