EDF and ArcelorMittal complete 12MW solar project in France

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: EDF

EDF Energies Nouvelles and steel maker ArcelorMittal Méditerranée have commissioned a 12MW solar plant in the Provence-Alpes-Côte d’Azur region of south-eastern France.

ArcelorMittal Méditerranée made 15 hectares of its industrial lands at the Fos-sur-Mer industrial and port complex available for the PV project, located in the Bouches-du-Rhône department.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The project includes 45,000 modules and generates the equivalent of the annual electricity consumption of 7,400 inhabitants.

Up to 40 people were involved in the 10-month-long construction of the plant.

To date, EDF Energies Nouvelles operates close to 1.5GW in wind and solar energy capacity in France.

EDF en was recently involved in the world's lowest ever solar bid in Saudi Arabia.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia