India steps closer to first lithium-ion cell facility, with cost and lifetime goals

Facebook
Twitter
LinkedIn
Reddit
Email
Credit: Ministry of science and technology

An Indian clean energy firm hopes to bring down the cost of lithium-ion cell manufacturing below INR15,000 (US$222) / kWh and create batteries for rooftop solar with a 25-year lifespan, by setting up a manufacturing facility in the southern state of Tamil Nadu.

Two research institutions and local developer Raasi Solar Power have signed a memorandum of understanding (MoU) for a technology transfer that moves India a step closer to having its first lithium-ion cell manufacturing facility.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The South Asian country until now has mostly drawn interest in battery assembly manufacturing and little on the cell side. This has led to Indian firms sourcing lithium-ion batteries mostly from China, Japan and South Korea among others. However, Indian power minister R.K. Singh recently chaired a meeting with battery-based energy storage manufacturers calling on them to set up manufacturing units in India.

While India’s large-scale stationary energy storage sector has been temporarily stunted by policy U-turns and tender cancellations, it has thriving deployments of storage in telecoms towers and ATMs among other smaller scale applications across the country. A government release said that India is one of the largest importers of lithium-ion batteries, having brought in nearly US$150 million worth of such batteries last year.

Technology transfer

A group at Central Electro Chemical Research Institute (CECRI), based in Karaikudi, Tamil Nadu, a national laboratory under the aegis of the Council of Scientific & Industrial Research (CSIR) has developed a new technology for lithium-ion cells in partnership with CSIR-National Physical Laboratory (CSIR-NPL) New Delhi, CSIR- Central Glass and Ceramic Research Institute (CSIR-CGCRI) Kolkata and Indian Institute of Chemical Technology (CSIR-IICT) Hyderabad.

Meanwhile, CSIR-CECRI has set up a demo facility in Chennai to manufacture prototype lithium-ion cells and a government release said this has the potential for mass production. Raasi Group plans to use this technology to set up the battery cell fab in Krishnagiri district of Tamil Nadu.

C. Narasimhan, chairman and managing director of Raasi Group, said: “We want to bring down the cost of cell manufacturing below INR15,000/kW to replace lead acid battery. We also have plans to make lithium-ion battery for solar rooftop with life span of 25 years to make it affordable enough to drive the photovoltaic segment.”

Minister for Science and Technology Dr Harsh Vardhan said: “Today’s development is a validation of the capabilities of CSIR and its laboratories to meet technology in critical areas to support our industry, besides other sectors. It will give tremendous boost to two flagship programmes of prime minister Narendra Modi – increasing the share of clean energy in the energy basket by generating 175GW by 2022, of which 100GW will be solar and the second, [the] National Electric Mobility Mission, to switch completely to electric vehicles by 2030.”

Vardhan highlighted that the project was in line with Modi’s ‘Make in India’ vision, which seeks to boost domestic manufacturing across all industries in India.

Dr Rahul Walawalkar, president and MD of Customized Energy Solutions (India) and an executive director of the India Energy Storage Alliance (IESA), has previously told Energy-Storage.News that where India has struggled to maintain competitiveness with China in the solar PV manufacturing space, it could compete in battery storage manufacturing if it moved fast.

Read Next

August 17, 2026
Saatvik Solar has signed an MoU with the Government of Odisha for a 3.6GW solar cell manufacturing facility at Gopalpur in Ganjam district.
August 17, 2026
India is set for record solar installations in 2026, while ALMM-II drives cell shortages and higher system prices, according to Wood Mackenzie.
August 12, 2026
Websol has begun a brownfield upgrade of a 600MW mono PERC cell manufacturing line to TOPCon, increasing its total cell capacity to 1.35GW.
August 10, 2026
Purvah Green Power has agreed to acquire six SPVs holding a combined 1.4GW of operational renewable energy capacity from ReNew Solar Power.
August 10, 2026
India’s SECI awarded 1GW to seven bidders under its RTC-TM tender, with Juniper securing the largest allocation.
August 7, 2026
India’s Ministry of New and Renewable Energy (MNRE) plans to announce a scheme covering more than 10GW of polysilicon production capacity.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye