LS Power to switch on ‘world’s largest’ battery in California amidst power crisis

Facebook
Twitter
LinkedIn
Reddit
Email
At the time of writing the Gateway Energy Storage project (pictured) has a capacity of 230MW, but this will reach 250MW by the end of August 2020. Image: LS Power.

Infrastructure company LS Power is to switch on what is thought to be the world’s largest single-site battery project at 250MW before the end of the month.

The Gateway Energy Storage project, located in San Diego, California, currently has a capacity of 230MW, but is on track to stand at 250MW by the end of the month.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The announcement comes amidst a raft of activity in California’s battery storage space. Asset management group Capital Dynamics and independent power producer Tenaska confirmed themselves to be collaborating on a 2GW battery pipeline in the state just yesterday, while hundreds of megawatts of energy storage projects have also been contracted for in recent months.

Greater emphasis has too been placed on energy storage in California this week as the state is currently in the throes of a significant heatwave which has placed great strain on the state’s power supply.

California’s Independent System Operator has issued numerous warnings of rolling blackouts this week as a result, while industry representatives have repeatedly refuted suggestions renewables and energy storage facilities are to blame for the strain on the grid, instead stating that greater proliferation of the two stood to solve such issues.

For more information on this story, visit our sister title Energy-Storage.news.

Additional reporting by Andy Colthorpe.

Read Next

June 17, 2026
Distributed solar developers including MCEC, Aligned Climate Capital and Catalyst Power have secured funding across US projects.
June 17, 2026
Independent power producer (IPP) Alluvial Power has reached commercial operation at its 150MWac project in Ford County, Kansas.
June 17, 2026
Foresight Group-backed developer NZ Clean Energy (NZCE) and Fonterra have signed a long-term virtual power purchase agreement (PPA) under which the dairy cooperative will purchase electricity generated by NZCE's Darfield solar-plus-storage project in Canterbury.
June 16, 2026
European inverter manufacturing capacity has now surpassed 100GW, according to figures from PV Tech Market Research.
Premium
June 16, 2026
PV Tech Premium sat down with Anne Loomis, partner at Troutman Pepper Locke, to discuss the safe harbour deadline for US solar developers.
June 16, 2026
Brisbane-based developer Renewable Energy Partners (REP) has expanded the Bogunda Energy Hub to include solar PV and battery energy storage, with the project now formally in early-stage development south of Hughenden in Queensland, Australia.

Upcoming Events

Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Solar Media Events
September 9, 2026
Schaumburg, Illinois
Media Partners, Solar Media Events
September 9, 2026