Mississippi Power, Silicon Ranch commission 50MW PV project in Mississippi

Facebook
Twitter
LinkedIn
Reddit
Email
The installation, which can produce enough energy to supply power to approximately 6,500 homes, is comprised of 200,000 panels. Image: Mississippi Power

Mississippi Power and Silicon Ranch have officially commissioned a 50MW solar project in Hattiesburg, Mississippi that is operating and providing energy to the Mississippi Power grid.

The installation, which can produce enough energy to supply power to approximately 6,500 homes, is comprised of approximately 200,000 panels and is located on 182 hectares in south Hattiesburg.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Mississippi Power president and CEO Anthony Wilson noted: “Over the last 15 months, Mississippi Power and our partners have turned renewable energy in our state from a dream into a reality. We’ve brought more than 100MW of solar power online in the last three months and I would like to thank the teams at Silicon Ranch, the Area Development Partnership and the Public Service Commission for their commitment to bringing this plant online to the benefit of the entire Pine Belt region.”

Silicon Ranch funded the construction of the PV project and will own and operate the facility for the long term. At its peak, construction on the site supported 350 jobs — many of which were awarded to local labor and local subcontractors.

Silicon Ranch president and CEO Matt Kisber added: “The leadership and Board of Directors at Mississippi Power deserve tremendous credit for their commitment to bring renewable power to southeast Mississippi.

“Silicon Ranch is honored to be the newest corporate citizen of the Hattiesburg community, and we look forward to collaborating with the Area Development Partnership to promote the economic and environmental benefits this project will bring to the city, to Forrest County and to the surrounding region for years to come.”

Mississippi Power is the state’s largest provider in renewable energy, with the company boasting nearly 160MW of approved solar generation.

16 June 2026
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 16-17 June 2026, will be our fifth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2028 and beyond.
13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

June 12, 2026
Silicon valley tech giant Meta has signed another power purchase agreement (PPA) with RWE for a solar project in Texas.
June 12, 2026
US independent power producer (IPP) MN8 Energy has reached commercial operations at two utility-scale solar PV plants totalling 260MW.
June 12, 2026
US independent power producer (IPP) Cypress Creek Energy has secured US$3.5 billion in financing to support the development of a 1.63GW/1.9GWh solar-plus-storage project in Arkansas.
June 11, 2026
The ongoing permitting challenge is a key factor slowing down solar manufacturing and deployment in the US, according to T1 Energy’s CEO, Dan Barcelo.
Premium
June 11, 2026
T1 Energy's CEO Dan Barcelo explains his optimism about US solar manufacturing and how it can deliver on the power demand growth.
June 11, 2026
GoldenPeaks Poland Holding has filed for Chapter 11 bankruptcy protection in the US after a severe liquidity crunch.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026