Philippines installed 122MW of solar in 2015

Facebook
Twitter
LinkedIn
Reddit
Email
The Philippines was earmarked as a key emerging marekt this year by IHS. Credit: REC Solar

The Philippines installed a total of 122MW of grid-connected solar PV in 2015, taking its tally to 144MW, up from 22MW the previous year, according to the latest figures from the Philippines Department of Energy (DOE).

As of 31 December 2015, there were 124 grid-connected projects in the pipeline that had been awarded under the country's renewable energy (RE) law, totalling 4,016MW. Meanwhile, there were 13 self-consumption projects totalling 2.4MW also awarded. Total self-consumption capacity stands at 1.9MW.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Furthermore, the DOE had a total of 59 projects pending under the RE law with a combined capacity of 1,456MW.

Earlier this year, Josefin Berg, senior solar analyst at market research firm, IHS, said the Philippines developed very quickly in 2015 after clarifying its feed-in tariff scheme and putting in a deadline for installations by March 2016.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Sydney, Australia