SECI’s 275MW solar tender in Uttar Pradesh to power Varanasi’s 100% renewables dream

January 5, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
Flickr: Lyle Vincent

Solar Energy Corporation of India (SECI) has issued a Request for Qualification (RfP) document for 275MW of grid-connected solar in the state of Uttar Pradesh.

The PV capacity, spread across six projects, will be located in the Uttar Pradesh Solar Park and power produced will go towards the goal of making the city of Varanasi a 100% renewable energy-powered city, according to the RfQ document. Bidding and e-reverse auctions will be conducted separately for each of the six projects.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Last May, at Intersolar Europe, former Indian power minister Piyush Goyal challenged the German city of Munich to race with Varanasi, one of the world's oldest cities, to become the first ever fully clean energy-powered city.

The six projects are as follows:

The six separate projects to be auctioned. Credit: SECI

SECI has fixed the project tariffs at INR3.43/kWh (US$0.054) for 25 years. SECI said that bidders will be “free to avail fiscal incentives like Accelerated Depreciation, Concessional Customs and Excise Duties, Tax Holidays, etc. as available for such projects”.

The tender comes under the National Solar Mission, Phase II, Batch IV, Tranch XIII.

Projects will be set up on a Build Own Operate basis and power will be sold to SECI.

Following central government announcments last November to tender 17GW of solar by March this year, one would expect a large amount of similar issuances to be produced in the coming weeks, although there are plenty of sceptics and there is a need for distribution companies (Discoms) to be willing to buy the power. At the end of December another 750MW were auctioned at Bhadla in Rajasthan.

Read Next

Premium
February 26, 2026
Analysis: As new duties threaten to block PV producers from India, Laos and Indonesia from the US market, the outcome of the Section 232 polysilicon investigation could put an end to the question of who will be next.
February 26, 2026
Indian solar manufacturer Premier Energies has unveiled a new zero busbar (0BB) TOPCon solar cell, a “first” in India, according to the company.
February 25, 2026
The US Department of Commerce (DoC) has proposed a 125.87% preliminary countervailing duty (CVD) on Indian solar cells.
February 23, 2026
Karnataka, Delhi, and Andhra Pradesh top decarbonisation, power ecosystem readiness, and market enablers, respectively, according to a joint report by IEEFA and Ember.
February 20, 2026
NTPC has commissioned 165MW of solar capacity at its 1.25GW Khavda-II solar project in Gujarat.
February 17, 2026
Jupiter International has commissioned its 1GW third solar cell production line online at its Baddi facility in Himachal Pradesh.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain