NextEra to build utility-scale solar-plus-storage project in Arizona

Facebook
Twitter
LinkedIn
Reddit
Email
Image: NextEra

NextEra Energy Resources will build a 10MW lithium-ion battery storage system paired with a 20MW PV installation for Arizona utility Salt River Project, with another battery system on the way.

A subsidiary of NextEra Energy Resources, which is itself a subsidiary of Florida-headquartered power generation company NextEra Energy, will construct and own the facility in Pinal County, near Coolidge, Arizona.  

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Salt River Project (SRP) has brokered a 20-year power purchase agreement (PPA) with NextEra, and will therefore buy all of the power generated at the Pinal Central Energy Centre, as the project will be known. It is expected to be completed by the end of this year.

The single-axis tracker PV farm will charge the battery for use when the sun is not shining, with Salt River Project likely to evaluate its usefulness in countering periods of peak demand and otherwise optimising the use and consumption of power from solar generation assets.

Community-based, not-for-profit utility SRP held a competitive solicitation process for the project and through this approved another battery facility, a 10MW system with four hours’ duration of energy storage, charging from the grid. However, SRP declined to give further details of this project until PPAs have been secured.

SRP has a goal in place to source 20% of its retail electricity from sustainable sources by 2020.

Arizona has a few large-scale energy storage projects in operation, mostly on a trial basis. This includes two 10MW projects for utility Tucson Electric Power, announced last year, one of which will be built by NextEra and the other by E.On.  

13 October 2026
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 13-14 October 2026 is our fourth PV CellTech conference dedicated to solar manufacturing in the USA. From polysilicon, wafers, ingots, cells and modules, to critical component suppliers including glass and frames, the event connects every stage of the value chain under one roof. PV CellTech USA also brings together investors, innovators, manufacturers and industry stakeholders to collaborate and strengthen domestic solar manufacturing across the United States.

Read Next

July 29, 2026
The Federal Communications Commission’s (FCC) Public Safety and Homeland Security Bureau (PSHSB) has added foreign-produced power inverters and “advanced robotic devices” as a national security threat.
July 29, 2026
Enphase Energy reported revenue of US$291.9 million for the second quarter, up 3.2% in the first quarter of 2026.
July 29, 2026
OCI Holdings has announced plans to double its annual solar-grade polysilicon production to 70,000MT by 2029.
July 28, 2026
US solar PV manufacturer T1 Energy has bought a set of patents for tunnel oxide passivated contact (TOPCon) solar cell and module technology which it said will “differentiate” its position in the US market.
July 27, 2026
NextEra Energy recorded a 9.5% increase in its net earnings in Q2 2026, as the company advanced its plan to merge with Dominion Energy.
July 24, 2026
Solar manufacturing giant Canadian Solar has opened the first phase of a 6GW heterojunction technology (HJT) solar cell facility in Jeffersonville, Indiana.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
April 20, 2027
Istanbul, Türkiye