Qair sets sights on Sicily with applications for 500MW of solar

Facebook
Twitter
LinkedIn
Reddit
Email

Independent power producer Qair has completed the applications for obtaining permits for 500MW of solar projects in Italy.

The French company is looking to acquire the projects in south-eastern Sicily, with the hope of positioning itself as a major player in renewable energies in Italy by consolidating a 1GW portfolio of projects in country.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“Our goal is to complete our first financings and build our projects by the end of 2022, in order to reach 500 MW of installed capacity by 2025,” explained Qair’s director for Italy Emmanuel Macqueron. He added his thanks to the team, whose “total commitment” had made the ambition possible.

Qair – known as Quadran International before 2020 – currently has 230 MW of power generation across 16 territories. Additionally, it has a pipeline of 930MW of renewables in the construction and financing phase, and 3GW of assets under development for future deployment.

Across Africa, South-East Asia, South America and Europe, the company is aiming to have commissioned 1GW of assets by 2022.

Read Next

November 13, 2026
Rezolv Energy has announced its partners for the construction of Dama Solar, its 1.36GWp solar PV project in Arad County, western Romania.
November 12, 2026
Investing in a portfolio that includes solar PV projects and BESS is a key tool to reduce exposure to price risk, according to Pexapark.
November 12, 2026
SMA Solar has narrowed its full-year guidance for 2026 towards the upper half of its previously raised range after reporting improved financial results for the first nine months of 2026.
Premium
November 12, 2026
Module testing challenges, the role of BESS and the procurement landscape were key topics of conversation at PV ModuleTech Europe 2026.
Sponsored
November 12, 2026
If two modules carry a Class A designation, how much can we actually conclude about their fire performance?
November 12, 2026
Almost 2GW of PV capacity is to be put out to tender in the latest phase of Saudi Arabia’s renewable energy procurement programme.

Upcoming Events

Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye