Qair sets sights on Sicily with applications for 500MW of solar

January 11, 2021
Facebook
Twitter
LinkedIn
Reddit
Email

Independent power producer Qair has completed the applications for obtaining permits for 500MW of solar projects in Italy.

The French company is looking to acquire the projects in south-eastern Sicily, with the hope of positioning itself as a major player in renewable energies in Italy by consolidating a 1GW portfolio of projects in country.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

“Our goal is to complete our first financings and build our projects by the end of 2022, in order to reach 500 MW of installed capacity by 2025,” explained Qair’s director for Italy Emmanuel Macqueron. He added his thanks to the team, whose “total commitment” had made the ambition possible.

Qair – known as Quadran International before 2020 – currently has 230 MW of power generation across 16 territories. Additionally, it has a pipeline of 930MW of renewables in the construction and financing phase, and 3GW of assets under development for future deployment.

Across Africa, South-East Asia, South America and Europe, the company is aiming to have commissioned 1GW of assets by 2022.

Read Next

December 9, 2025
Indian solar PV manufacturer Waaree Energies has signed a 288MWp solar module supply deal with US project developer Sabanci Renewables.
December 8, 2025
Norwegian renewable energy firm Scatec has signed equity deals for a massive solar-plus-storage project in Egypt and begun operations at a site in South Africa.
December 8, 2025
The Colombian government has created Gecelca Solar, a solar PV-focused arm of its public utility company Gecelca.
December 8, 2025
Proper training and adherence to best field practices are necessary to halt the steady trend of PV connector failures resulting from poor workmanship, write Brian Mills and Grayson Maurer.
December 8, 2025
Swedish independent power producer (IPP) Alight Energy has commissioned a 215MW agrivoltaics project in Denmark.
December 5, 2025
Over 140 US solar companies have urged Congress to reconsider changes to permitting which they say have resulted in “a nearly complete moratorium” on solar project permits.

Upcoming Events

Upcoming Webinars
December 17, 2025
2pm GMT / 3pm CET
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA