Sainty International Group and Gesolar have agreed to join forces and build China’s largest rooftop solar system. The 10MW array is to be located in Siyang, Jiangsu, and will be connected to the grid before the end of 2011.
This second phase of the Siyang project will dwarf the 4MW first phase and generate 10751MWh of electricity a year and 269GWh over the course of its 25-year lifespan. As with the first phase, Gesolar will provide the modules and carry out installation duties.
This article requires Premium SubscriptionBasic (FREE) Subscription
Already a subscriber? Sign In
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
“With successful experience from Phase I and technical know-how, we can build Phase II better,” said Stephen Tong, Gesolar’s general manager. “China is a big market we can’t miss and we hope to provide more clean energy for our own country.”