
PV manufacturer JA Solar has filed an application for an injunction against rival LONGi in the Unified Patent Court (UPC) in Europe.
Information on the case released by the UPC last week reveals that JA’s Spanish subsidiary, JA Solar Energy Spain SL, is seeking provisional measures against LONGi’s parent company and European subsidiaries in relation to European patent EP3185307.
Try Premium for just $1
- Full premium access for the first month at only $1
- Converts to an annual rate after 30 days unless cancelled
- Cancel anytime during the trial period
Premium Benefits
- Expert industry analysis and interviews
- Digital access to PV Tech Power journal
- Exclusive event discounts
Or get the full Premium subscription right away
Or continue reading this article for free
Entitled ‘Solar Cell and Method for Manufacturing the Same’, EP3185307 covers the design and manufacturing of specifically back-contact solar cells.
An application for provisional measures is distinct from a full infringement claim and can be lodged to prevent ongoing or imminent infringement, for example, to prevent an alleged infringer from making or selling a disputed product.
The court documents contain no further detail on the nature of the claims, but as back-contact technology is a central feature of LONGi’s module offering, the nature of the patent under dispute would seem to be significant. In recent years, a number of the big-name module manufacturers have engaged in patent litigation over emerging technologies, with many using it as a tactical play to gain a competitive advantage over rivals.
The case was lodged on 12 October with the Düsseldorf division of the UPC, which comprises judges from all participating member states of the European Union. It names Longi Green Energy Technology Co. Ltd. Longi Solar Technologie GmbH, Longi Solar France SARL, Longi (Netherlands) Trading B.V. and LONGi Solar Technology Co., Ltd. as defendants.
In response, a court order issued on 18 November sets a deadline of 8 December for all five LONGi defendants to file an objection to JA Solar’s application for provisional measures. Should an objection be filed, the court said it would hold a hearing on the matter on 11 February 2027.
PV Tech has contacted JA and LONGi for further detail and comment on the case.