Schott Solar to shutter PV module production facility in Billerica, MA

Facebook
Twitter
LinkedIn
Reddit
Email

Schott Solar will shutter its 15-MW module manufacturing facility in Billerica, MA, effective July 31 as part of efforts to streamline its global manufacturing operations. The move will affect 180 full-time employees and 45 temporary workers at the plant, although the company said it will offer jobs to those affected at other sites where available.

The company stated that because of limitations in the size and scale of the Billerica factory (which was acquired by Schott in 2005 after buying out JV partner RWE), it decided further investment in the site was not a viable option.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Schott recently inaugurated a $100 million state-of-the-art solar manufacturing facility in Albuquerque, NM, where it expects to reach 85 MW of production capacity by the end of 2009.

“As one of the pioneer solar technology facilities, Billerica has an important place in the history of photovoltaic industry development,” said Gerald Fine, president/CEO of Schott North America. “Solar manufacturing has evolved over the years, and current production facilities are built at a scale that is not achievable in Billerica.”

The company said that customer questions and warranties on products manufactured at the Massachusetts plant will continue to be handled through its North American sales office in Roseville, CA. Schott Solar leases the Billerica facility, which will be returned to the landlord once vacated.

Read Next

June 17, 2025
New solar manufacturing facilities show higher rates of product defects, PV Tech has heard from Joerg Althaus of Clean Energy Associates.
Premium
June 17, 2025
PV Tech spoke with Joerg Althaus of CEA about the under-explored issues with solar racking, trackers and other technical concerns.
June 17, 2025
The European Investment Bank (EIB) will invest €1.6 billion to support the construction of the Bay of Biscay interconnector.
Premium
June 17, 2025
Traditional PV inspection methods using direct current polarisation have proved unreliable in detecting certain issues. Researchers from Enertis Applus+ detail a new approach to defect detection aimed at improving the efficiency of PV system maintenance and performance analysis.
June 17, 2025
The levelised cost of energy (LCOE) for utility-scale solar PV in the US has tightened for a third year in a row, according to Lazard’s latest report.
June 17, 2025
Blue Elephant Energy has received a €200 million (US$214 million) investment from European asset management company Infranity.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
June 30, 2025
10am PST / 6pm BST
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Media Partners, Solar Media Events
July 2, 2025
Bangkok, Thailand
Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico