Solar FlexRack signs supply deal with Swinerton for 26.4MW PV project

Facebook
Twitter
LinkedIn
Reddit
Email
The Tobacco Valley solar project, located in Simsbury, Connecticut, will be installed with Solar FlexRack's Series G3-X fixed tilt solution. Image: SolarFlexRack

Solar FlexRack, a division of Northern States Metals and PV mounting and solar tracker solutions company, has completed a contract to supply a 26.4MW solar installation for Swinerton Renewable Energy. 

Swinerton will serve as the project's engineering, procurement, and construction company. The Tobacco Valley solar project, located in Simsbury, Connecticut, will be installed with Solar FlexRack's Series G3-X fixed tilt solution, which is known for its performance in challenging climates.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

George Hershman, general manager, Swinerton Renewable Energy, said: “Swinerton Renewable Energy is dedicated to building solar projects that provide maximum value for our clients, our partners and the community, and our suppliers are instrumental in meeting this goal. We're pleased to have a proven partner like Solar FlexRack on this project.”

Steve Daniel, executive vice president of Solar FlexRack, added: “Swinerton Renewable Energy is an employee-owned organization which maintains a high standard for the work they complete, their employees and commitment to the communities in which they work. They build responsibly and that philosophy is driven throughout their organization.”

Construction is already underway, with the Tobacco Valley solar project scheduled for completion in 2019. In total, the project is expected to generate enough energy to power 6,800 homes and create over 300 construction jobs.

21 May 2024
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 21-22 May 2024, will be our third PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2025 and beyond.
8 October 2024
San Francisco Bay Area, USA
PV Tech has been running an annual PV CellTech Conference since 2016. PV CellTech USA, on 8-9 October 2024 is our second PV CellTech conference dedicated to the U.S. manufacturing sector. The event in 2023 was a sell out success and 2024 will once again gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing in the U.S. out to 2030 and beyond.

Read Next

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 10, 2024
Dallas, Texas USA
Solar Media Events
April 17, 2024
Lisbon, Portugal
Solar Media Events
May 1, 2024
Dallas, Texas
Solar Media Events
May 21, 2024
Napa, USA