Spain’s Grupo Clavijo supplies trackers to 12.56MW PV plant in Sri Lanka

Facebook
Twitter
LinkedIn
Reddit
Email
This project has consolidated the Spanish firm’s internationalisation, having now installed over 12GW worldwide, with more than 600MW still currently in development. Source: Grupo Clavijo

One of Europe’s leading tracker vendors Grupo Clavijo has expanded its footprint into Asia by supplying trackers to the 12.56MW Solar One Ceylon solar PV plant in Sri Lanka.

On behalf of developer Windforce, Grupo Clavijo installed 624 single-axis trackers. The project also features JA Solar polycrystalline panels. The plant was completed in five months and is located in the local town of Welikanda.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

This project has consolidated the Spanish firm’s internationalisation, having now installed over 12GW worldwide, with more than 600MW still currently in development. Most recently, Grupo Clavijo has expanded its work in Latin America, with projects in Puerto Rico and Brazil

Read Next

Premium
July 25, 2025
At the SNEC expo, Carrie Xiao took the temperature of the industry as it seeks a way out of cutthroat competition and squeezed margins.
July 25, 2025
VDE Americas has verified the successful deployment of the hail mitigation function of GameChange Solar’s Genius trackers.
July 22, 2025
Chinese module manufacturer JA Solar will supply 1GW of solar modules to UAE power company Masdar for two projects in Azerbaijan. 
July 8, 2025
German solar glass manufacturer Glasmanufaktur Brandenburg (GMB) has filed for insolvency after posting monthly losses of €900,000 this year.
July 7, 2025
GameChange Solar has announced plans to supply trackers for the 1GW second phase of the Abydos project in Egypt.
July 4, 2025
Risen Energy’s mass-produced heterojunction (HJT) modules have reached a cell conversion efficiency of 26.61%, a record figure for the company.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK