Kyocera achieves 8.3% degradation on 20-year installation

Facebook
Twitter
LinkedIn
Reddit
Email

Kyocera has released, what the company deems to be, conclusive evidence that its solar modules show only 8.3% degradation after 20 years. The Atomic Energy and Alternative Energies Commission (CEA) used a sample from Kyocera’s 945W roof installation in the small village of Lhuis, Lyon, France, to test under laboratory conditions. The results demonstrate that the modules were still performing at 91.7% of their original maximum power output.

The installation, commissioned in 1992 by Hespul, a French non-profit organization, consists of 15 modules each with an output of 63W.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The company enthuses that its solar modules were the first in the world to be certified by TÜV Rheinland and the non-profit Fraunhofer Center for Silicon Photovoltaics CSP's potential induced degradation (PID) test demonstrated that Kyocera's modules did not show any degradation after being subjected to high voltage stress testing.

At the time Tatsumi Maeda, general manager of the Kyocera Group said, “As a pioneer in the industry Kyocera has been involved in R&D and manufacturing of solar power generating systems for more than 35 years and in that time we have developed numerous innovations and manufacturing technologies to ensure the high quality and long-term durability of our products.”

Read Next

August 6, 2025
The first MW-scale floating solar project in the Philippines has come online, according to solar EPC contractor Black & Veatch.
August 6, 2025
Clean Energy Associates has warned its clients of a renewed danger of Uyghur Forced Labour Prevention Act enforcement against solar PV products under US president Donald Trump and secretary of state Marco Rubio.
Premium
August 6, 2025
PV Talk: LevelTen’s Andrés Acosta discusses how an oversupply of clean projects is shaping Europe’s PPA market.
August 6, 2025
Independent power producer (IPP) Scatec has secured BRL150 million (US$27 million) for its 142MW solar PV plant in Minas Gerais, Brazil. 
August 6, 2025
The RMI has published updated guidance on how resilience to damage from tropical cyclones can be built into all PV systems.
August 6, 2025
A subsidiary of JinkoSolar has filed a lawsuit in Munich accusing LONGi Green Energy and several subsidiaries of infringing on a solar cell manufacturing patent.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
September 2, 2025
Mexico City, Mexico
Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK