SC Solar supplying 5.2GW heterojunction module equipment line to Reliance Industries in India

Facebook
Twitter
LinkedIn
Reddit
Email
The 5.2GW equipment supply agreement will be the largest heterojunction supply signed in the industry according to SC Solar. Image: REC Group.

Solar equipment manufacturer SC Solar has signed a 5.2GW heterojunction module automation production line supply agreement with Indian conglomerate Reliance Industries.

The product being supplied to Reliance is the “largest” solar module production line in India, according to the SC Solar, a Chinese equipment manufacturer which added it is also the largest heterojunction line project in the industry.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Reliance Industries continues to increase its investment in renewables after signing a memorandum of interest with the state of Gujarat a year ago to invest upwards of US$80 billion over 10-15 years to add 100GW of installed capacity while setting up solar PV module manufacturing facilities in the state.

More recently the company announced it would begin production at its 10GW solar cell and module factory, in the state of Gujarat, by 2024.

Moreover, SC Solar’s line of work is around research and development, manufacturing, sales and services of equipment in the solar industry and works around TOPCon, heterojunction and perovskite solar cell and module technology.

The China-based equipment manufacturer previously provided a solar module production line in India to Adani Solar, who recently produced the country’s “first” monocrystalline silicon ingot and aims to reach 2GW of capacity by the end of 2023.

In the past year, India has accelerated its plans to build a domestic solar manufacturing capacity with the launch of a basic customs duty (BCD) on solar cells (25%) and modules (40%) in April to reduce the country’s dependence on Chinese modules imports while setting a second round of its production-linked incentive scheme to add 65GW of manufacturing capacity.

However, with module supply constrained due to the BCD and the short supply of domestic capacity, consultancy Bridge to India expects solar projects in India to be postponed or shelved this year.

Read Next

May 6, 2025
The global solar market will continue to slow in 2025 after 2024 saw the total capacity growth rate decrease by over 50%, according to a report from SolarPower Europe (SPE).
May 6, 2025
While other technologies exist, c-Si solar PV technology is the leading candidate for large-scale energy production, writes Radovan Kopecek.
April 24, 2025
Tata Power Renewable Energy has signed a power purchase agreement (PPA) with Tata Motors to build a 131MW wind-solar hybrid energy project.
April 16, 2025
Chinese, Indian and American companies have strengthened their positions atop the solar industry’s EPC rankings, according to Wiki-Solar.
April 15, 2025
Renewable energy will need policy support to reach “economically optimal” levels for the global energy transition, according to BloomberNEF.
April 10, 2025
India has added 11.6GW and 25.3GW of annual nameplate capacity in 2024 for solar cells and PV modules, respectively.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 8, 2025
Asia