Acciona Energía and Swicorp sign PPAs for 186MW of solar in Egypt

Facebook
Twitter
LinkedIn
Reddit
Email
The projects mark Acciona’s first foray into renewable energy within Egypt. Credit: Acciona

Acciona Energía and Saudi Arabian firm Swicorp, via renewable energy platform Enara Bahrain, are to build and own three solar PV plants with a combined capacity of 186MW in the Benban solar complex in Aswan, Egypt.

The three 50MWac (62MWp) plants, requiring US$180 million investment, will be equipped with190,774 polycrystalline silicon modules from Jinko Solar, mounted on horizontal-axis tracking structures made by STI Norland.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The projects mark Acciona’s first foray into renewable energy within Egypt.

25-year Power Purchase Agreements (PPAs) and corresponding network connection contracts (NCCs) have been signed today with Egyptian Electricity Transmission Company (EETC).

The three projects also come under Egypt’s Round 2 feed-in tariff (FiT) programme launched in October last year.

The projects are expected to produce enough power for the equivalent of around 150,000 Egyptian homes.

Both International Finance Corporation (IFC) and Asian Infrastructure Investment Bank (AIIB) provided financing for the projects.

“We are very pleased to increase our presence in an area with great potential in the long run for the renewable energy sector as is North Africa, working with such reputable partner as Swicorp with the support of IFC and AIIB,” said Acciona Energía CEO Rafael Mateo.

Construction work is expected to start in December 2017, with commissiong planned 12 months after. 

Read Next

Premium
July 18, 2024
“We believe this policy will unlock opportunities for renewables as it increases electricity supply avenues."
July 18, 2024
Egypt aims to accelerate the approval process for new renewables capacity to be constructed in the country.
July 15, 2024
Chinese solar module manufacturer Jinko Solar has secured two contracts to supply 150MW of modules to two solar PV projects in Algeria.
July 12, 2024
Swiss Utility BKW Energie AG has sign a power purchase agreement with food and beverage company Nestlé in Germany.
July 11, 2024
Iberdrola has signed a power purchase agreement with fast food chain Burger King to supply power from part of a 553MW solar PV plant. 
July 10, 2024
The PPA will allow GKN Automotive to source power from Recurrent Energy's Rey I solar PV project located in Seville, Spain.

Subscribe to Newsletter

Upcoming Events

Upcoming Webinars
July 31, 2024
1:00 PM (BST) / 2:00PM (CEST)
Solar Media Events
September 24, 2024
Warsaw, Poland
Solar Media Events
September 24, 2024
Singapore, Asia
Solar Media Events
October 8, 2024
San Francisco Bay Area, USA