Back for the tenth year, the 2024 PV Module Reliability Scorecard from Kiwa PVEL is now live, and there’s lots to unpack from the broad range of results. The good news is that we had more Top Performers than ever before, and there’s been improvement in many of the tests in our Product Qualification Program (PQP). Notably, 84% and 95% of modules tested had less than 2% power loss in our thermal cycling (TC) and mechanical stress sequence (MSS) tests, respectively, and 96% of modules tested had less than 1% power loss following light induced degradation (LID) and light and elevated temperature induced degradation (LETID).

At the same time, failures have also increased at the manufacturer and bill of materials (BOM) levels. Two-thirds of manufacturers experienced at least one test failure, the highest percentage ever reported in the Scorecard. The failure rate at the BOM level also increased to 41% of all BOMs tested having at least one failure, up from 32% in 2023 and 26% in 2022 and 2021.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Because the PQP is a series of qualification tests, not certification tests, there are no defined pass/fail requirements; it is up to the module manufacturer and their customers to determine what is acceptable. However, we classify failures in the Scorecard across several categories:

-Safety failure: Modules not meeting IEC 61215 requirements for electrical insulation resistance.

–          Power degradation: Modules that experienced power loss greater than the manufacturer’s requirements, triggering a retest.

-Visual: Modules with “major” visual inspection findings as classified by the IEC 61215 criteria.

-Diode: Modules with bypass diodes that become open-circuited or short-circuited.

This graph shows the percentage of BOMs experiencing a failure in each test sequence of the PQP by failure type. Initial failures are those that are detected during characterisations prior to stress-testing, and were the most common occurrence of PQP failure. Note that UVID failures are not shown. Image: Kiwa PVEL

Drilling down on reported failures

While overall results have been improving for many tests, we notice some concerning failure trends when we take a closer look at results by test. Pre-stress testing failures continue to be problematic. Over a quarter of manufacturers experienced at least one of these, including missing junction box lids, peeling nameplate labels, wet leakage testing failures, delamination and diode failures. These “out of the box” failures should be far less prevalent than what we’re seeing in the lab.

A total of 11% of BOMs tested for the 2024 Scorecard experienced one or more failures during TC testing. Designed to simulate the temperature fluctuations during a module’s lifetime, TC testing revealed some major junction box issues, such as shorted bypass diodes, exposed wires and melted connectors. Additionally, five TOPCon BOMs and one PERC BOM experienced power degradation that was significantly more than the manufacturers’ anticipations.

In the damp heat (DH) test, which instigates long-term degradation and failure modes that are typical in high temperatures and high humidity conditions, we likewise saw an 11% failure rate. The DH failure rate was double that reported in the 2023 Scorecard, with 15 manufacturers experiencing at least one failure during DH testing, including  delamination, junction box lids falling off, electrical insulation faults and power loss.

Some of these TC and DH issues are explored further in an earlier PV Tech article from the Kiwa PVEL team.

A junction box experienced a rapid unscheduled disassembly during TC testing, resulting in rear glass breakage. This was likely caused by an electrical arc within the bypass diode or a JB soldering issue. Four manufacturers experienced at least one failing bypass diodes in the past year of PQP testing. Image: Kiwa PVEL

One doesn’t have to look further than the module’s junction box to find the source of many failures. Thirty-four percent of manufacturers experienced one or more junction box related failures. Kiwa PVEL has highlighted the issue of junction box failures in the past five editions of the Scorecard, yet these failures continue at an alarming rate.

In the 2024 Scorecard, we reported that 17% of manufacturers had junction box covers falling off, 11% of manufacturers had wet leakage/safety failures traced to the junction box, 8% of manufacturers had bypass diode failures and 6% of manufacturers had melted/damaged connectors.

While these failure statistics may be disheartening, we encourage the industry to learn from them and make the necessary improvements. As shown by the improvements in recent LID+LETID results, the industry can collectively resolve module reliability issues. We aim to foster continued collaborative research and open dialogue, as when it comes to module failures, ignorance is not bliss. We applaud the manufacturers who have committed to accelerated testing and transparency, as identifying and addressing potential issues makes us stronger as an industry.

The complete scorecard has been made available in both an online digital format and via downloadable PDF at www.scorecard.pvel.com.

Tristan Erion-Lorico is a VP of sales and marketing at Kiwa PVEL, and Max Macpherson is a data analytics and reports manager.

Read Next

September 16, 2025
IB Solar is investing INR30 billion (US$340 million) in a 4GW TOPCon solar cell and module manufacturing plant in Jewar, Uttar Pradesh.
September 15, 2025
Sunrun has priced a securitisation of leases and power purchase agreements, taking its non-recourse debt capital raised in Q3 above US$1.5 billion. 
September 15, 2025
Norwegian energy firm Statkraft has agreed to divest a portion of its renewable energy portfolio to Serentica Renewables.
September 15, 2025
UNSW spin-out company Lab360 Solar has been awarded funding from ARENA to bring its drone-based PV inspection technology to market.
September 15, 2025
Vikram Solar has secured a contract to supply 200MW of modules to AB Energia, a domestic solar engineering, procurement, and construction (EPC) solutions provider. 
September 12, 2025
Colombian energy supplier Celsia is seeking more than US$1.2 billion in investment to build wind and solar generation projects in Peru. 

Subscribe to Newsletter

Upcoming Events

Solar Media Events
September 16, 2025
Athens, Greece
Solar Media Events
September 30, 2025
Seattle, USA
Solar Media Events
October 1, 2025
London, UK
Solar Media Events
October 2, 2025
London,UK
Solar Media Events
October 7, 2025
Manila, Philippines