Construction starts on Chile’s first solar-storage project, featuring LatAm’s largest battery

Facebook
Twitter
LinkedIn
Reddit
Email
AES-Siemens joint venture company Fluence will provide its Sunstack battery storage systems (pictured) to the project. Image: Fluence.

AES Gener has broken ground on a 112MW / 560MWh battery energy storage project in Chile, said to be Latin America’s largest such facility to date.

The system, also hailed as Chile’s first solar-plus-storage project, will be capable of storing energy generated from nearby solar and wind facilities for up to five hours.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

AES Gener, the local subsidiary of multinational power generation and distribution firm AES Corporation, will develop the project, to be paired with 253MW of renewable generation. That will include the 180MW Andes Solar II B project, under construction in Antofagasta, Chile.

Andes Solar II B will be built with 10MW of modular, prefabricated solar PV panels and 170MW of bifacial solar PV panels of the type AES Gener has already deployed in the 80MW Andes Solar II A project which has already begun construction.

The solar energy to be integrated into the national electricity system with the batteries will be built on mountain ranges in Antofagasta in the Atacama Desert, enjoying a combination of high solar irradiance at relatively low temperatures. 

For more on this story, please visit our sister publication Energy-Storage.news.

Read Next

June 5, 2026
French utility Engie will invest close to €100 million (US$114 million) in a 155MW solar PV project at its Castelnou power station. 
June 3, 2026
The insurance market will need to evolve its underwriting approaches to keep pace with the rapid growth of co-located renewable energy projects, according to a new report.
June 1, 2026
Grenergy has signed a 12-year hybrid power purchase agreement (PPA) in Chile linked to the fifth phase of its Oasis de Atacama solar-plus-storage platform.
May 29, 2026
Zelestra has completed the sale of its Latin America platform to Promigas in a deal valued at approximately US$1.1 billion.
May 20, 2026
Price is the main barrier to PPAs being transacted in the UK market today, a panel at the Renewable Procurement and Revenue Summit said.
May 12, 2026
Spanish IPP Grenergy has secured US$268 million towards a 342MW/1,034MWh solar-plus-storage project in Chile.

Upcoming Events

Solar Media Events
June 16, 2026
Napa, USA
Media Partners, Solar Media Events
June 30, 2026
Sacramento, California
Media Partners, Solar Media Events
August 25, 2026
São Paulo, Brazil
Media Partners, Solar Media Events
September 1, 2026
Mexico City, Mexico
Media Partners, Solar Media Events
September 9, 2026