GoodWe’s new MT series inverters provide greater output power for large DG projects

Facebook
Twitter
LinkedIn
Reddit
Email
GoodWe's new MT series inverters provide greater output power for large DG projects. Image: GoodWe

GoodWe’s new MT Series inverter boost function offers a continuous maximum AC output power overload of 15% for higher yield and quicker ROI, according to the company.
 
GoodWe has launched its brand new second generation of MT Series string inverters, GW50K-MT and GW60K-MT, for large scale commercial rooftops and ground-mounted solar PV systems. Apart from offering a more compact design and competitive price, the new MT Series provide a continuous power boost function to achieve a higher yield and quicker return on investment. 

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Conventional inverters are usually able to temporary boost the AC output power but cannot offer a continuous and cost-effective solution to maximize the output from high-voltage solar modules. Therefore, a larger number of inverters is required to achieve a higher ouput, leading to a significant increase in capital expenditures and operating costs.

Solution

The new GoodWe MT Series provides a continuous maximum AC output power overload of up to 15% which allows to significantly reduce the total number of inverters to be installed, while minimizing labor and installation costs. It also features a more compact design with less than 20% volume and lighter weight compared to other conventional models, which greatly simplifies installation and commissioning. With capacities of 50 kW and 60 kW, the new transformerless, three-phase GoodWe MT series grid-tied inverters are equipped with four MPPTs ensuring that the outputs of connected modules are able to generate the highest yields even in different PV installation conditions. In addition, it also allows a wireless communication network for monitoring and control of the entire system through smartphone, tablet or laptop.

Applications

Large scale commercial rooftops and ground-mounted solar PV systems

Platform

Two different MT Series string inverters, GW50K-MT and GW60K-MT, are available to adapt to customers' requirements in terms of output power.

Availability

Currently available

17 June 2025
Napa, USA
PV Tech has been running PV ModuleTech Conferences since 2017. PV ModuleTech USA, on 17-18 June 2025, will be our fourth PV ModulelTech conference dedicated to the U.S. utility scale solar sector. The event will gather the key stakeholders from solar developers, solar asset owners and investors, PV manufacturing, policy-making and and all interested downstream channels and third-party entities. The goal is simple: to map out the PV module supply channels to the U.S. out to 2026 and beyond.

Read Next

March 21, 2025
Edify Energy has submitted plans for a 100MW solar-plus-storage project in New South Wales to the Australian government’s EPBC Act.
March 21, 2025
Developer Fotowatio Renewable Ventures (FRV) Australia has acquired a 190MW hybrid solar PV and energy storage project in Victoria from Acen Australia.
March 20, 2025
A study from consultancy LCP Delta has underlined the importance of flexibility to Europe’s energy transition as the dominance of renewable energy generation grows.  
March 20, 2025
Uncertainty over tax credits could cause 84% of investors and 73% of developers to decrease their activity in renewable energy, according to ACORE.
March 19, 2025
The US$334 million will support the construction of the 200MW Branch and the 50MW Genesee Solar projects in Michigan.
March 19, 2025
Meta has signed offtake deals for various utility-scale PV projects, many of which are in Texas, where it has relocated some operations.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
March 25, 2025
Lisbon, Portugal
Solar Media Events
March 26, 2025
Renaissance Dallas Addison Hotel, Dallas, Texas
Media Partners, Solar Media Events
April 23, 2025
Fortaleza, Brazil
Solar Media Events
April 29, 2025
Dallas, Texas
Media Partners, Solar Media Events
May 7, 2025
Munich, Germany