India clarifies any form of energy storage permitted in wind-solar hybrids

August 14, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
Hero Future Energies' soalr wind hybrid project in Karnataka, the first large-scale hybrid in India. Credit: Solar Media

India’s Ministry of New and Renewable Energy (MNRE) has issued an amendment to its National Wind-Solar Hybrid Policy, clarifying that any form of energy storage – not just batteries – can be used in hybrid projects.

Parts of the original policy had specified ‘battery storage’ thereby restricting other forms of storage such as pumped hydro, compressed air, and flywheels, among others. The word ‘battery’ has now been removed from the relevant clauses of the policy.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Clause 5.4 now reads: “Storage may be added to the hybrid project (i) to reduce the variability of output power from wind solar hybrid plant; (ii) providing higher energy output for a given capacity (bid/ sanctioned capacity) at delivery point, by installing additional capacity of wind and solar power in a wind solar hybrid plant; and (iii) ensuring availability of firm power for a particular period.

“Bidding factors for wind solar hybrid plants with storage may include minimum firm power output throughout the day or for defined hours during the day, extent of variability allowed in output power, unit price of electricity, etc.”

The hybrid policy was finalised in May this year. In Late June, Solar Energy Corporation of India (SECI) then issued a Request for Selection (RfS) document for 2.5GW of hybrid wind and solar projects to be connected to the Interstate Transmission System (ISTS).

Draft National Energy Storage Mission

India has also released Draft National Energy Storage Mission (NESM) document, which claims that battery manufacturing represents a “huge economic opportunity for India”.

The joint report, which focuses on the potential for scaling up domestic manufacturing of batteries for EVs, was written by NITI Aayog (the National Institution for Transforming India) and US think-tank Rocky Mountain Institute (RMI).

The full story on the Draft can be found on PV Tech sister site Energy.Storage.News.

Read Next

March 2, 2026
India is expected to add 42.5GW of new solar capacity in 2026, according to research analyst JMK Research’s Q4 2025 (Oct-Dec) India RE Update report. 
March 2, 2026
German wet processing equipment manufacturer RENA Technologies will supply its equipment to a planned 1.2GW TOPCon solar cell production facility in India.
Premium
February 26, 2026
Analysis: As new duties threaten to block PV producers from India, Laos and Indonesia from the US market, the outcome of the Section 232 polysilicon investigation could put an end to the question of who will be next.
February 26, 2026
Indian solar manufacturer Premier Energies has unveiled a new zero busbar (0BB) TOPCon solar cell, a “first” in India, according to the company.
February 26, 2026
Co-located storage has been “overhyped” as a prop for commercially underperforming solar assets in Europe and should not be regarded as a “silver bullet”.
February 25, 2026
The US Department of Commerce (DoC) has proposed a 125.87% preliminary countervailing duty (CVD) on Indian solar cells.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain