ISC Konstanz signs n-type bifacial and IBC cell technology transfer to Valoe for commercialisation

May 3, 2018
Facebook
Twitter
LinkedIn
Reddit
Email
ISC Konstanz has signed a technology transfer agreement with PV module assembly equipment supplier based in Finland for R&D centre’s advanced ‘BiSoN’ (Bifacial Solar cell On N-type) and ZEBRA (diffused n-type IBC) solar cell technology. Image: Megacell

The International Solar Energy Research Center Konstanz e.V. (ISC Konstanz) has signed a technology transfer agreement with PV module assembly equipment supplier based in Finland for R&D centre’s advanced ‘BiSoN’ (Bifacial Solar cell On N-type) and ZEBRA (diffused n-type IBC) solar cell technology.

Valoe noted that it had acquired a solar cell production line from Megacell S.r.l., which was under liquidation, and a producer of bifacial n-PERT solar cells in Italy based on the ISC Konstanz technology.

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Valoe noted that it had acquired a solar cell production line from Megacell S.r.l., which was under liquidation, and a producer of bifacial n-PERT solar cells in Italy based on the ISC Konstanz technology. Image: Megacell

Dr. Radovan Kopecek, CTO at ISC Konstanz and Managing Director of Advanced Cell Concepts: “We are very pleased to continue assisting you in developing ZEBRA further. Together with Valoe´s back contact module technology such a module using ZEBRA is very powerful at low costs. Valoe has, as one of the first companies in the world, developed a mass scale module manufacturing technology which makes the implementation of back contact solar cells into the module extremely simple, cost effective and with high yield. Further, Valoe’s technology makes it possible to use thinner solar cells. The PV market is now ready for such modules build on IBC cell technology for many new applications.”

Valoe also noted that it planned to transfer part of the production line to PV manufacturer Soli Tek Cells’ production facility in Lithuania to undertake volume production of IBC solar cells for customers of Valoe, sometime in 2019.

Valoe also noted that it planned to transfer part of the production line to PV manufacturer Soli Tek Cells’ production facility in Lithuania. Image: Soli Tek

ZEBRA based IBC cells have reach conversion efficiencies of more than 23% and module efficiencies would be supported Valoe’s unique back contact module technology that can also handle ultra-thin N-type mono wafers, lowering production costs. 

Valoe’s unique back contact module technology that can also handle ultra-thin N-type mono wafers, lowering production costs. Image: Valoe
9 March 2027
Location To Be Confirmed
PV CellTech Global will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. Join us in Q1 of 2027

Read Next

November 17, 2025
Jakson Group has started Phase 1 construction of its 6GW integrated solar ingot, wafer, cell and module manufacturing facility at Maksi, Madhya Pradesh.
November 17, 2025
India’s race to 500GW is being slowed by critical grid bottlenecks, NTPC PMI’s Abhinav Jindal told PV Tech.
November 17, 2025
Saatvik Green Energy, through its subsidiary Saatvik Solar Industries, has secured solar PV module orders worth INR1.77 billion (US$19.9 million). 
November 17, 2025
US solar module manufacturer First Solar will build a new production facility in the state of South Carolina, which will bring its US nameplate manufacturing capacity to 17.7GW by 2027.
Premium
November 17, 2025
PV Talk: India’s race to 500GW of clean energy is being slowed by critical bottlenecks. NTPC PMI’s deputy general manager Abhinav Jindal tells Shreeyashi Ojha what steps India must urgently take to stay on track with its 2030 targets.
November 14, 2025
Lightsource bp has started construction on its 330MWp Valle 3 and 4 project in Wamba, Valladolid, in the Castilla y Leon region of Spain. 

Upcoming Events

Solar Media Events
November 25, 2025
Warsaw, Poland
Solar Media Events
December 2, 2025
Málaga, Spain
Solar Media Events
February 3, 2026
London, UK
Solar Media Events
March 24, 2026
Lisbon, Portugal
Solar Media Events
June 16, 2026
Napa, USA