JA Solar places US$18.8 million PERC cell equipment order with Meyer Burger

Facebook
Twitter
LinkedIn
Reddit
Email
Meyer Burger said that the tool order, valued at over CHF 18 million (US$18.8 million) included its MAiA 2.1 platform for inline PERC cell plasma processes, SiNA PECVD cell coating systems for anti-reflection and passivation layer coating and its DW288 water-based diamond wire cutting technology for monocrystalline wafers.

Leading PV manufacturing equipment supplier Meyer Burger has received a major PERC (Passivated Emitter Rear Cell) upgrade order from ‘Silicon Module Super League’ (SMSL) member JA Solar. 

Meyer Burger said that the tool order, valued at over CHF18 million (US$18.8 million) included its MAiA 2.1 platform for inline PERC cell plasma processes, SiNA PECVD cell coating systems for anti-reflection and passivation layer coating and its DW288 water-based diamond wire cutting technology for monocrystalline wafers. 

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

The company said that the JA Solar order equated to total annual output of approximately 1.5GW. 

Meyer Burger expects tool delivery and commissioning to occur in the second half of 2016.

JA Solar recently reported that expected full-year 2016 shipments to be in the range of 5.2GW to 5.5GW, including 250MW to 300MW of module shipments to its downstream projects.

The company is increasing its manufacturing capacity to match expected demand, which would include expanding in-house wafer capacity to 2.0GW, solar cell capacity to 5.5GW and module capacity to 5.5GW by the end of 2016.

Read Next

Premium
August 21, 2026
ES Foundry's Alex Zhu outlines how the US cell maker is betting on PERC while navigating shifting regulations and supply-chain constraints.
August 17, 2026
China’s polysilicon market saw no new transactions last week, with quoted prices remaining at the previous week’s baseline.
August 14, 2026
Foreign Entity of Concern rules create a multitude of new risks for US solar developers, some less visible than others. Intertek CEA’s Jordan Wilson explores the key steps towards minimising FEOC exposure in PV module purchase agreements.
August 13, 2026
South Korean PV producer Hanwha Solutions, parent company of Q Cells, has had a long-contested passivation patent revoked in Europe.
August 12, 2026
This week's PV Chart of the Week profiles the technology breakdown of projected US solar cell production capacity.
August 12, 2026
Researchers in Australia have heralded a potential breakthrough in recovering valuable silver from decommissioned PV modules.

Upcoming Events

Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain
Solar Media Events
November 24, 2026
Warsaw, Poland
Solar Media Events
February 2, 2027
London, UK
Solar Media Events
April 20, 2027
Istanbul, Türkiye