Marubeni consortium signs PPA for 105MW solar project in Oman

Facebook
Twitter
LinkedIn
Reddit
Email

A consortium led by Japanese firm Marubeni Corporation has signed a 23-year power purchase agreement with Petroleum Development Oman (PDO) for the 105MW Amin Solar PV IPP Project.

The consortium also included Oman Oil Facilities Development Company (OOFDC), Bahwan Renewable Energy Company, and Modern Channel Services (MCS). The special purpose company is shared in the following equities: Marubeni 50.1%; OOFDC 30%; Bahwan 10%; and MCS 9.9%. Financing is still being arranged at present.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

This project, awarded to the Marubeni consortium last October, is said to be the first large-scale PV plant in Oman.

Marubeni has also had the 2GW Sur Gas Fired Combined Cycle IPP Project operational in Oman since 2014.

Oman Power and Water Procurement Company (OPWP) also revealed in November the three players who have submitted bids for its 500MW solar tender.

21 May 2025
London, UK
The Renewables Procurement & Revenues Summit serves as the European platform for connecting renewable energy suppliers to the future of energy demand. This includes bringing together a community of European off-takers, renewable generators, utilities, asset owners, and financiers. The challenges ahead are complex, but through collaboration, innovation, and a shared vision, we can navigate uncertainties and forge a sustainable energy future. Let us harness our collective knowledge to advance the renewable energy agenda.

Read Next

April 28, 2025
Swiss renewable power developer Axpo and EDF Renewables Hellas have signed a power purchase agreement (PPAs) for 102MW of solar capacity.
April 23, 2025
Shanghai Electric and Masdar have signed an agreement to build the 2GW Sadawi solar project in Saudi Arabia.
April 22, 2025
Solar PV developer Atlas Renewable Energy has secured US$510 million in financing for a solar-plus-storage project in Antofagasta, Chile.
April 16, 2025
Europe completed power purchase agreements (PPAs) for 1.6GW of renewable energy capacity in March, according to Pexapark.
April 11, 2025
A 10-year solar-based PPA will play an integral role in a new agreement that will see BOC Australia replace 45% of its power with renewables.
April 7, 2025
The PPA will enable the construction of a 238MW PV plant in Peru and increase Zelestra’s Peruvian contracted portfolio to more than 530MW.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK
Solar Media Events
July 1, 2025
London, UK