Mondragon develops a high-throughput 150MW ‘Front Line’ tabbing and stringing system

February 23, 2017
Facebook
Twitter
LinkedIn
Reddit
Email
The Mondragon 150MW annual capacity Front Line system consists of two of its MTS 2500 tabbers and stringers and an IC150 interconnect system. Image: Mondragon Assembly

Mondragon Assembly has introduced a new 150MW annual capacity automated ‘Front Line’ tabber and stringer that includes an interconnect system. The high-throughput system in small footprint system provides improved space accommodation and flexibility for a wide-range of busbar configurations. 

Problem

This article requires Premium SubscriptionBasic (FREE) Subscription

Try Premium for just $1

  • Full premium access for the first month at only $1
  • Converts to an annual rate after 30 days unless cancelled
  • Cancel anytime during the trial period

Premium Benefits

  • Expert industry analysis and interviews
  • Digital access to PV Tech Power journal
  • Exclusive event discounts

Or get the full Premium subscription right away

Or continue reading this article for free

Due to the decrease in raw material costs, photovoltaic energy has become one of the cheapest energy sources in the market, having achieved an exponential growth in recent years. In light of this growth, module manufacturers increasingly require higher throughput production lines with higher degrees of automation and flexibility. As the number of busbars in the photovoltaic cells increases, the bussing, or interconnected welding process, becomes a bottleneck in many production lines.

Solution

The Mondragon 150MW annual capacity Front Line system consists of two of its MTS 2500 tabbers and stringers and an IC150 interconnect system.  This Front Line is designed to manufacture panels with cells of up to 6 busbars. The MTS 2500 tabber and stringer also enables a net production capacity of 2,400 cells per hour in a single welding track, which is claimed to be the fastest in the market to date and significantly reduces production bottlenecks with increased busbar configurations. Mondragon Assembly’s IC150 interconnect system is also designed to allow module manufacturers to increase the production rate while ensuring the product quality. The system is also suitable for half-cut cells. 

Applications

High-throughput tabbing and stringing in a small footprint and is suitable for half-cut cells and different technologies and wafer sizes.

Platform

Its innovative interconnection system allows the MTS 2500 Tabber and Stringer to reach a net production capacity of 2400 cells per hour. The MTS 2500 Tabber is designed to process cells of different technologies and sizes, and is capable of welding cells with up to 6 busbar. Thanks to its compact design, it only requires 7.5m2 floor space area. 

Availability

January, 2017 onwards.

Read Next

March 13, 2026
Current solar PV module price increases are largely dictated by five major components, according to data from Intertek CEA
March 12, 2026
PV Tech Research’s annual ranking of the top ten PV module manufacturers reveals some signs of recovery after a turbulent 2025, writes Moustafa Ramadan.
March 11, 2026
VDE Americas has updated its hail risk model with new wind data, claiming it will improve the accuracy of hail-damage predictions for PV projects.
March 9, 2026
Spanish independent power producer (IPP) Zelestra has secured a US$176 million green financing package for its 242MWdc Babilonia solar project in Peru. 
March 9, 2026
Hanwha Qcells has resumed normal production at its solar module assembly plants in the US state of Georgia after some of its products were detained by US customs.
March 6, 2026
US solar manufacturer Silfab Solar has disputed some reports of chemical spillages at its manufacturing facility in Fort Mill, South Carolina.

Upcoming Events

Solar Media Events
March 24, 2026
Dallas, Texas
Solar Media Events
April 15, 2026
Milan, Italy
Solar Media Events
June 16, 2026
Napa, USA
Solar Media Events
October 13, 2026
San Francisco Bay Area, USA
Solar Media Events
November 3, 2026
Málaga, Spain